OMH Creedmoor Psychiatric Center Building 40 Automatic Transfer Switch Replacement (EOI)
Issued by Dormitory Authority of the State of New York (DASNY) · via Dormitory Authority of the State of New York — RFPs and bids
- Published
- 27 Aug 2026
- Closes
- 30 Sept 2027
- Location
- United States
- Sector
- Construction & Infrastructure
This notice was amended
Details changed after publication. Re-check the official notice before bidding.
- Submission deadline changed from 17 Sept 2026 to 30 Sept 2027First seen by FreeTender on 27 Aug 2026 — most portals don’t publish when a corrigendum was issued.
At a glance
Dormitory Authority of the State of New York (DASNY) in United States has published a request for proposals in construction & infrastructure: “OMH Creedmoor Psychiatric Center Building 40 Automatic Transfer Switch Replacement (EOI)”. Submissions close on 30 September 2027, 339 days from today. FreeTender has recorded 44 notices from this buyer since 2026, 42 of them currently open. There are 353 open construction & infrastructure notices in United States on FreeTender. Bids are submitted to the buyer through Dormitory Authority of the State of New York — RFPs and bids, not through FreeTender.
Details
OMH Creedmoor Psychiatric Center Building 40 Automatic Transfer Switch Replacement (EOI)
Solicitation #: 3881909999 Issue Date: 08/20/2026 Proposal Due: 09/17/2026 - 2:00 PM Classification: Construction Contracts Type: Expression of Interest (EOI) Status: New Subcontracting Provisioning Goals (%) Minority Owned: 18% Women Owned: 12% Service Disabled Veteran Owned: 6% Contract Terms September 30, 2027 Location Where Goods to be Delivered or Service Performed Creedmoor PC, 79-25 Winchester Blvd, Queens Villiage, NY 11427 Ad Notice THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY See the Eligibility Requirements further down in this document. The project consists of, but is not limited to, the removal and replacement of the existing Automatic Transfer Switch in Building 40, including associated electrical connections, wiring, testing, commissioning, and all required incidental work to provide a complete and fully operational system. Estimated Cost Range for Scope of Work: $600,000 - $650,000. Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice. Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid. Please find links to the specifications and drawings below: Creedmoor PC - Project Manual Creedmoor PC - Drawings General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents. The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows: Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45 % Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18 % Women's Business Enterprise Goal 12 % Service-Disabled Veteran Owned Businesses 6 % Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid. Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to [email protected] . Instructions for Submission of the EOI Packages: Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection. Each package shall be submitted with: A Cover Page that clearly identifies: The Legal Name of the Company submitting the EOI The Project Name for which the EOI is being submitted The Date of Submission Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation. Tabs must be in the following sequence: Tab 1 – Company Profile Provide a company profile that includes the following information: Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project. Date Established – When the company was founded. Company Address – Primary business location. Ownership Information – Name and resumes of all principal owners. Client List – Summary of public and private sector clients. Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers. Equipment - Overview of all equipment owned by the company. Self-Performed Services - Description of all services the company performs directly (not subcontracted). MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certifications (if applicable). Tab 2 – Experience Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed. Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information: Name of the project designer Firm name and contact information Project title and location/facility Brief description of the project Total construction cost Construction start date Substantial completion date Indicate role as prime contractor or subcontractor Percentage of the work that was self-performed If applicable, also include a list of all DASNY projects completed within the last 5 years. Tab 3 – Project Schedules Provide three (3) sample project schedules for the same projects listed in Tab 2 . These schedules should reflect projects of similar size, scope, and complexity to the referenced project. Tab 4 – Safety Program Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety. Tab 5 – Résumés Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative. Tab 6 – Potential Subcontractors Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and
Issued by Dormitory Authority of the State of New York (DASNY).
Context for bidders
We hold 44 notices from Dormitory Authority of the State of New York (DASNY), going back to August 2026 — 42 of them still open. They buy mostly in Construction & Infrastructure, Education & Training and Facility Management & Cleaning. There are 353 open Construction & Infrastructure tenders in United States. This one closes in 339 days.
More from this buyer
- SUNY Buffalo Governors Complex AHU Replacements and Asbestos and Lead Abatement· closes 1 Aug
- NYSLSPHL - Furnish and Deliver Class I Biological Safety Cabinets
- SUNY University at Buffalo Clement Heat Exchanger Replacement Including Asbestos Abatement and Hazardous Materials Abatement· closes 17 Sept
- CUNY - Eugenio Maria De Hostos Community College - Furnish and Install AV Equipment
- OASAS C.K. Post Addiction Treatment Center No. 854 Roof Replacement and Asbestos and HAZMAT Abatement· closes 28 Jan
Similar Construction & Infrastructure tenders
- TRIENNIAL Electrical Maintenance - Amendment 4 POP: 12/01/2026 - 11/30/2027 Plus 4 Option Years· closes 9 Nov
- RWP - Advanced Navigation Simulation Environment Laboratory (ANSEL)· closes 12 Nov
- Replacement of 10 Ton HVAC Unit, Bldg.11, PR ANG· closes 3 Nov
- A-E Services for Electron Injector Complex· closes 30 Nov
- Chino Emergency Repairs — Maintenance of Other Residential Buildings· closes 9 Nov
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- proposed renovation of njabini marketNyandarua County Government · Kenya
- Строительно-монтажные работы по объекту: «Строительство сетей водоотведения социально-делового центра с парковой зоной «Алтын орда» г.Актобе» г.Актобе Актюбинский области»ГУ "Отдел строительства города Актобе" · Kazakhstan
- Услуги по осуществлению технического надзора по объекту: «Строительство сетей водоотведения социально-делового центра с парковой зоной «Алтын орда» г.Актобе» г.Актобе Актюбинский области»ГУ "Отдел строительства города Актобе" · Kazakhstan
- Replacement of damaged 2 Nos. PVC Water Storage Tanks in BSNL MW Staff Quarter Colony, TE Compound, Solan (HP)BSNL — Himachal Pradesh · India
- Replacement of single phase Submersible pump motor set in place of faulty submersible pump at TE/Staff Quarter under Muzaffarpur BABSNL — Bihar · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →