FreeTender
Accepting bidsitbNetherlands

Netherlands – Energy-efficiency consultancy services – Onderzoek/verkenning energiegemeenschappen

Issued by Bizob · via TED — Tenders Electronic Daily (EU)

Published
29 Oct 2026
Closes
14 Dec 2026, 23:59 UTC
Value
EUR 580,000
Reference
751110-2026
Location
Netherlands
Sector
Construction & Infrastructure
Type
services

At a glance

Bizob in Netherlands has published an invitation to bid in construction & infrastructure: “Netherlands – Energy-efficiency consultancy services – Onderzoek/verkenning energiegemeenschappen”. Submissions close on 14 December 2026, 47 days from today. The stated value is EUR 580,000. Quote reference 751110-2026 in any correspondence with the buyer. One document is attached to this notice. FreeTender has recorded 20 notices from this buyer since 2024, 11 of them currently open. There are 418 open construction & infrastructure notices in Netherlands on FreeTender. Bids are submitted to the buyer through TED — Tenders Electronic Daily (EU), not through FreeTender.

Details

De gemeenten Bergeijk, Bladel, Eersel, Oirschot en Reusel-De Mierden (hierna: aanbestedende dienst of opdrachtgever) besteden deze opdracht in gezamenlijkheid aan. Bizob treedt op als aanbestedende dienst voor deze aanbesteding namens alle hiervoor genoemde organisaties. De opdracht heeft in eerste instantie betrekking op de uitvoering van de externe verkenning, aangeduid als fase 2. De beoogde ingangsdatum van de overeenkomst is 1 maart 2027. Omdat de opdracht op basis van een hybride specificatie (functionele eisen aangevuld met technische uitvoeringsvoorwaarden) in de markt wordt gezet (zie hoofdstuk 2), kent de overeenkomst geen vaste looptijd. Het betreft een eenmalige, resultaatgerichte dienstverlening die uiterlijk binnen 12 maanden na start wordt afgerond, waarbij geldt dat het eindresultaat formeel door de individuele opdrachtgever dient te zijn geaccepteerd. Beoogd wordt dat het op te leveren eindproduct uiterlijk medio januari 2028 gereed is voor bestuurlijke besluitvorming. Afhankelijk van het resultaat van fase 2 en de besluitvorming hieromtrent door opdrachtgever, kan per individuele gemeente besloten worden tot opdrachtverstrekking voor de optionele vervolgfase (fase 3). Deze fase ziet op de ondersteuning bij de verdere uitwerking en realisatie van initiatieven en energiegemeenschappen. De uitvoering van deze fase is voorzien in de periode vanaf 1 februari 2028 tot en met een nader te bepalen einddatum. De daadwerkelijke doorlooptijd van fase 3 is afhankelijk van verschillende factoren, waaronder de uitkomsten van de externe verkenning, de aard en kenmerken van de initiatieven en de benodigde bestuurlijke besluitvorming. Het tempo en de fasering van de uitvoering kunnen hierdoor per initiatief en gemeente, verschillen.

Lots Lot 1 — Onderzoek/verkenning energiegemeenschappen (estimated 580000)

Buyer: Bizob

Buyer country: NLD

Procedure: open

CPV code: 71314300

Full notice, tender documents and how to bid are on the official TED page (link above).

Context for bidders

We hold 20 notices from Bizob, going back to January 2024 — 11 of them still open. They buy mostly in Water & Environment, Agriculture & Food and Energy & Power. There are 418 open Construction & Infrastructure tenders in Netherlands. This one closes in 47 days.

Documents

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →