NCTPS II M-I Circle- BM Unit-II Annual overhaul of Replacement of severely corroded and damaged discharge ducts of PA fans and FD fans during the year
Issued by TNEB Limited · TANGEDCO · CE-NCTPS-II - TANGEDCO · SE-Mechanical Maintenance I-NCTPS-II - TANGEDCO · via Tamil Nadu — tntenders
- Published
- 14 Sept 2026
- Closes
- 28 Sept 2026, 14:00 UTC
- Bid opening
- 29 Sept 2026, 14:30 UTC
- Reference
- NCTPS_II_UII_Spec_59_26_27
- Location
- Tamil Nadu, India
Details
- Tender Type
- Open Tender
- Contract Form
- Works
- Tender Category
- Works
- Product Category
- Maintenance Works
- EMD
- 4,700
- Period of Work
- NA
- Pre-Bid Meeting
- NA
- Pincode
- 600120
NCTPS II M-I Circle- BM Unit-II Annual overhaul of Replacement of severely corroded and damaged discharge ducts of PA fans and FD fans during the year 2026-27
Documents required from bidders: tech, price.
Tender documents published on the portal: tech, price (download requires a GePNIC login).
Context for bidders
We hold 13 notices from TNEB Limited · TANGEDCO · CE-NCTPS-II - TANGEDCO · SE-Mechanical Maintenance I-NCTPS-II - TANGEDCO, going back to August 2026 — 12 of them still open. They buy mostly in Manufacturing & Supply and Energy & Power. This one closes in 15 days.
More from this buyer
- NCTPS II M-I Circle - BM - Unit-II - AOH 2026-27-Replacement of the severely eroded and damaged C1, C2, D1 D2 stream Splitter assembly in flue gas duct at ESP inlet· closes 28 Sept
- NCTPS II MI Circle - BM Dn.- Unit-II - Annual Overhaul of Flue Gas Duct - APH hopper area and ESP outlet to Chimney Inlet duct - Inspection, rectification of eroded Punctured duct portions by patch welding, renewal of damaged eroded bracing pipes· closes 28 Sept
- NCTPS II M-I Circle - BM - Unit-II - AOH 2026-27-Replacement of the severely eroded and damaged A1, A2, B1 B2 stream Splitter assembly in flue gas duct at ESP inlet· closes 28 Sept
- NCTPS II M I Circle BM Division Unit-II Boiler 600 MW Providing steps from 66mtr EL to 43 mtr EL in Boiler rear side for ease of maintenance and free movement of men material during Breakdown AOH works· closes 28 Sept
- NCTPS-II M I Circle Boiler maintenance Division Unit-II Providing platform extension work in boiler LHS walkway ladder area at 9 Mtr elevation to facilitate to keep Cup-lock scaffolding materials during AOH period safe free movement of· closes 28 Sept
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →