Innovative technologies and solutions to improve wave and tidal energy systems
Issued by European Commission · via EU Funding & Tenders Portal
- Published
- 14 Nov 2026
- Closes
- 31 Mar 2027
- Reference
- HORIZON-CL5-2027-02-D3-09
- Location
- European Union
- Sector
- Forestry & Wildlife
At a glance
European Commission in European Union has published a funding call in forestry & wildlife: “Innovative technologies and solutions to improve wave and tidal energy systems”. Submissions close on 31 March 2027, 137 days from today. Quote reference HORIZON-CL5-2027-02-D3-09 in any correspondence with the buyer. FreeTender has recorded 423 notices from this buyer since 2026, 407 of them currently open. There are 40 open forestry & wildlife notices in European Union on FreeTender. Bids are submitted to the buyer through EU Funding & Tenders Portal, not through FreeTender.
Key requirements
Taken from the notice by FreeTender. The tender document on the official portal is binding — check it, and any corrigendum, before you bid.
To bid on EU public procurement
Most EU buyers ask for the European Single Procurement Document (ESPD) as a self-declaration with the bid. Submission is on the e-procurement platform named in the notice.
Details
Expected Outcome:
Project results are expected to contribute to all following expected outcomes:
- Advance in the realisation of the Strategic Energy Technology (SET) Plan’s research and innovation priorities and targets for ocean energy;
- Energy producers and consumers benefit from increased performance of wave and tidal energy technologies with the focus on efficiency and flexibility, reduced cost, improved reliability and sustainability, operation and maintenance, robustness and security during all stages of the lifetime of an ocean energy farm from installation, operation and maintenance to decommissioning;
- Efficient and effective support to ocean energy research and innovation through alignment and cooperation among different actors, avoiding fragmentation of efforts providing effectively a significant developmental boost of wave and tidal energy technologies.
- Increased contribution of ocean energy to the energy system, with minimal impacts on health and the environment (notably biodiversity) and at the lowest possible cost.
Scope:
The action contributes to address the Strategic Energy Technology (SET) Plan’s research and innovation priorities [1] and targets [1] for ocean energy focussing on wave and tidal energy development. It will take into account the input defined in this context by the Implementation Working Group on ocean energy (IWG ocean), the European Technology and Innovation Platform on ocean energy (ETIP Ocean) [3] and the European Energy Research Alliance (EERA) joint programme on ocean energy [4] . The overarching objective is the development and demonstration of cost-effective wave and tidal energy systems that can survive in a harsh ocean or sea environment with minimal impacts on health and the environment and biodiversity. The challenge is open to proposals seeking to steer wave and tidal energy development for different type of resources in an effective way at a European level and to bring these technologies to the market. In this action the following can be considered:
- The development and demonstration in controlled environment of innovative wave energy devices.
- The development and demonstration in controlled environment of innovative next generation tidal energy devices
- The development and demonstration of new sustainable materials in ocean energy converters, moorings and foundations whilst ensuring structural integrity, durability and circularity can be considered.
- The development and demonstration of sustainable tailored mooring and connection of electrical or other power transmission systems (cable system, electrical equipment, ....) for wave and tidal energy devices. Advance combined mooring and electrical connectors or hydraulic power transmission to reduce component cost and number of connection operations, included in systems for sharing an anchor between devices in arrays. Develop novel systems for safe and quick connection/disconnection that do not require large vessels and/or diving teams.
- The instrumentation for condition monitoring and predictive maintenance of ocean energy devices and structures. Apply recent advances in condition and structural health monitoring from other sectors to ocean energy. The use of Artificial Intelligence (AI) in ocean energy technology development.
- Advanced manufacturing of ocean energy devices and structures and auxiliary equipment considering reduced energy, manufacturing costs and materials consumption, high production throughput and optimization of logistics.
- Development of technologies and solutions for the installation, maintenance and decommissioning of wave and tidal energy devices.
The validation and demonstration of new ocean energy technologies should be done in a controlled environment meaning that this is done under monitored and reproducible conditions, using for instance, test rigs and test tanks, semi-enclosed basins, or dedicated real-sea demonstration sites with instrumented monitoring infrastructure. Structure, breakdown of activities and budget allocation The action consists of activities directly implemented by the consortium and activities implemented through financial support to third parties. The latter can include cooperation with the activities undertaken by the beneficiaries of the EU grant and may complement them. The R&I activities are divided into three challenges:
- Breakthrough challenge
- Validation challenge
- Demonstration challenge
The breakthrough and the validation challenge can be carried out both through activities directly implemented by the core consortium and through FSTP activities. The demonstration challenge will solely be implemented by the core consortium. The breakthrough challenge entails actions to develop new solutions, tools and new knowledge to increase the competitiveness of the ocean energy sector and on the acceleration of ocean energy deployment at scale. The aim is that the innovative technologies have been at least validated towards the end of the project. The validation challenge entail actions to validate technologies, tools and innovative solutions both in a laboratory and in a relevant environment which have been developed in the project or have been developed previously or separately in other European and national projects. FSTP can be used for new illustrative application use-cases demonstrating well defined added value to end users. In the demonstration challenge the consortium is expected to carry out demonstration activities (up to TRL 7) in line with the priorities set by the SET Plan ocean energy R&I priorities and targets and accelerate the take up of innovation by the industry. The demonstration activities will be selected using the stage gate approach developed by the IEA OES task 12 [5] . Activities directly implemented by the core consortium The activities of the core consortium are expected to include direct research and innovation activities in any of the areas listed in scope and in any of the challenges (breakthrough, validation, demonstration). The core consortium will be responsible for the management of the whole project, including the actions carried out through financial support to third parties (management of the FSTP calls, management of the FSTP projects). It is expected that the budget dedicated to the project management will not exceed 7% of the EU funding. The project is expected to carry out at least three demonstration activities. The focus of each demonstration activity should be clearly different from each other. The project is expected to include a clear go/no go milestone for each demonstration activity before entering the deployment phase. Before this go/no-go milestone, the project has to show evidence of having in place i) all needed permits for deployment, ii) complete, detailed and realistic engineering plans compliant with the applicable standards, and iv) a complete business and implementation plan. The proposal is expected to present a clear and convincing pathway to obtain necessary permits for the demonstration activities and allow for appropriate timelines to achieve these, while demonstrating how it will get a financial close for each demonstration activity. For this the use of other EU/national/regional support mechanisms can be considered. The total maximum amount of EU funding for the activities in the demonstration challenge is expected to be 24 million Euros. Activities implemented through Financial Support to Third Parties (FSTP) A share of the EU funding will be implemented through financial support to third parties and used to engage research organizations, academia, start-ups, scale-ups, SME’s, industries and other entities and to enable use-cases that are not yet identified in the proposal stage. The use of financial support to third parties should allow a faster implementation of research and innovation activities, and to respond to disruptive developments, attracting different stakeholders and innovators. A tiered app
Context for bidders
We hold 423 notices from European Commission, going back to August 2026 — 407 of them still open. They buy mostly in Water & Environment, IT & Telecom and Healthcare & Pharma. There are 40 open Forestry & Wildlife tenders in European Union. This one closes in 137 days.
More from this buyer
- The impact of EU labour mobility on the Member States of the EU· closes 23 Sept
- Inclusive and climate resilient multimodal passenger hubs enhancing modal shift towards sustainable transport and shared mobility· closes 7 Oct
- Advancing interdisciplinary, data-driven research at the biodiversity- health interface under a One Health approach· closes 16 Sept
- Assessing the effect of airport operations on air quality and noise in nearby communities· closes 14 Apr
- Higher Voltage, Megawatt Charging System compatible, modular powertrain for Heavy Duty Vehicles (HDV) (2ZERO Partnership)· closes 14 Apr
Similar Forestry & Wildlife tenders
- Fostering common farmland birds and mammals for resilient food production systems· closes 22 Sept
- Integrating Remote Sensing and in-situ observations of Biodiversity, towards a fully interoperable observation and data framework· closes 22 Sept
- Advancing interdisciplinary, data-driven research at the biodiversity- health interface under a One Health approach· closes 16 Sept
- Strengthening plant health: addressing emerging plant pest risks· closes 8 Apr
- Health of ecosystems and wild species, predictions and impacts on human health, in the face of existing and emerging stressors, from a One Health approach· closes 22 Sept
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this forestry & wildlife opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Forestry & Wildlife tenders
- Provision of E-Wireline Logging and Technical Services for Qatarenergy Onshore and Offshore OperationsQatarEnergy · Qatar
- поставка древесины топливнойФКУ ИК-5 УФСИН РОССИИ ПО ВОЛОГОДСКОЙ ОБЛАСТИ · Russia
- Выполнение работ по спилу и вывозу аварийных деревьев на территории Корохоткинского территориального комитета управления по развитию территорий муниципального образования «Смоленский муниципальный округ» Смоленской областиКОРОХОТКИНСКИЙ ТЕРРИТОРИАЛЬНЫЙ КОМИТЕТ УПРАВЛЕНИЯ ПО РАЗВИТИЮ ТЕРРИТОРИЙ АДМИНИСТРАЦИИ МУНИЦИПАЛЬНОГО ОБРАЗОВАНИЯ "СМОЛЕНСКИЙ МУНИЦИПАЛЬНЫЙ ОКРУГ" СМОЛЕНСКОЙ ОБЛАСТИ · Russia
- Оказание услуг по устройству минерализованных полос в населенных пунктах МКУ "Абрамово"АДМИНИСТРАЦИЯ ГОРОДСКОГО ОКРУГА ГОРОД АРЗАМАС НИЖЕГОРОДСКОЙ ОБЛАСТИ · Russia
- Оказание услуг по валке аварийных деревьевГОСУДАРСТВЕННОЕ КАЗЕННОЕ УЧРЕЖДЕНИЕ КРАСНОДАРСКОГО КРАЯ "ЦЕНТР ПАТРИОТИЧЕСКОГО ВОСПИТАНИЯ МОЛОДЕЖИ КУБАНИ" · Russia
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →