FreeTender
Accepting bidsgrant

Demonstration of hydropower technologies for efficient and forward-looking refurbishment of existing hydropower plants

Issued by European Commission · via EU Funding & Tenders Portal

Published
4 Aug 2027
Closes
1 Dec 2027
Reference
HORIZON-CL5-2027-07
Sector
Manufacturing & Supply

Details

Expected Outcome:

For a renewables-based electricity system sufficient flexible and also in the long-run fully sustainable hydropower capacity is pivotal. Project results are expected to contribute to all of the following expected outcomes:

  • Enhancing the capacities of the hydropower fleet to contribute with variable renewables base load to a secure and stable electricity system, including by modernising grid integration and hydropower fleet control.
  • Increase technology leadership, competitiveness and technology export potential of European hydropower industry.
  • Address challenges of climate change adaptation for a forward-looking and stable operation of sustainable hydropower for the coming decades.

Scope:

Demonstration of hydropower technology solutions which allow for efficient and forward-looking refurbishment of existing hydropower plants. Provided solutions must be socioeconomically and environmentally sustainable (including biodiversity) and provide a respective assessment. Issues which can be addressed are for example: Innovative design of turbines (and also draft tubes, nozzles and distributors) and generators, including innovative improvements based on future load cycles and extending their intended life time; new models and simulation tools for harsher operational conditions; digitalisation and artificial intelligence to advance instrumentation and controls and flexibility and to develop innovative operational strategies towards reduced O&M costs; transient aspect linked to new operating patterns of hydro plants to cope with climate changes and renewable base load; new materials for increased efficiency and resistance of equipment and increased performance, life time and resilience of infrastructure including e.g. phasing out of PFAS and mineral oils; low-GHG balance concrete; automated maintenance of metal hydropower turbines to reduce cost; operator hazards and reduce LCoE related to OPEX; Improving water uses resilience via integrated operations and management; simulation and forecasting tools for integrated risk and mitigation analysis for climate change adaptation and in response to extreme weather events by taking fully into account biodiversity requirements by targeting good ecological status and e.g. fish migration; water flows and sediment dynamics not hampering flexible hydropower production, innovative techniques for enhancing the life time of concrete structures and the overtopping safety of embankment and rockfill structures. null Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B. Activities may start at any TRL.

Type of action: HORIZON Innovation Actions

Programme period: 2021 - 2027

Priorities: RePowerEU, DigitalAgenda, AI

"> General conditions

1. Admissibility Conditions: Proposal page limit and layout

described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.

Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.

2. Eligible Countries

described in Annex B of the Work Programme General Annexes. A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide .

3. Other Eligible Conditions

If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

Subject to restrictions for the protection of European communication networks.

described in Annex B of the Work Programme General Annexes.

4. Financial and operational capacity and exclusion

described in Annex C of the Work Programme General Annexes.

5a. Evaluation and award: Award criteria, scoring and thresholds

are described in Annex D of the Work Programme General Annexes.

5b. Evaluation and award: Submission and evaluation processes

are described in Annex F of the Work Programme General Annexes and the Online Manual .

5c. Evaluation and award: Indicative timeline for evaluati

Context for bidders

European Commission has 6 open notices on FreeTender. There are 687 open Manufacturing & Supply tenders. This one closes in 466 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this manufacturing & supply opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Manufacturing & Supply tenders

All Manufacturing & Supply tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →