FreeTender
Accepting bidstenderUnited Kingdom

Heating, Electrical, Mechanical and Decarbonisation Framework

Issued by EASTERN PROCUREMENT LIMITED · via UK Find a Tender Service

Published
11 Sept 2026
Closes
21 Oct 2026, 11:00 UTC
Value
GBP 1,06,09,72,300.47
Reference
ocds-h6vhtk-0696e6
Location
United Kingdom
Sector
Energy & Power
Type
works

Details

The procurement will establish a single combined, multi-supplier Heating, Electrical, Mechanical and Decarbonisation Framework, not divided into lots, for the provision of works and associated services to domestic and non-domestic properties and buildings, including occupied and void properties. The scope will include, but is not limited to, the provision, supply, installation, replacement, upgrading, servicing, statutory and safety inspection, testing, planned and responsive maintenance and repair of heating, electrical, mechanical, renewable, low-carbon and associated energy systems. Heating works and services will include domestic and commercial/communal systems and equipment using gas, oil, solid fuel, electricity and renewable or low-carbon technologies, including gas and oil boilers, electric storage and panel heaters, electric low-pressure hot water boilers, air source heat pumps, solar-assisted heat pumps, ground source heat pumps, biomass boilers, combined heat and power and micro-CHP systems, heat networks, solar thermal systems, microgeneration installations, wind turbines and other emerging renewable heating and energy technologies. Associated heating and hot-water systems may include hot and cold water services, vented and unvented hot-water cylinders, oil storage tanks, flues, pumps, filling loops, pipework, radiators, low-surface-temperature radiators, fan convectors, controls, smart thermostats and associated electrical controls, together with pipework system cleaning, flushing, de-sludging, de-scaling, sterilisation, water treatment and pipe insulation. The framework will include annual heating safety checks and servicing, Landlord safety and compliance requirements, servicing and maintenance of thermostatic mixing valves and unvented cylinders, planned and responsive repairs, breakdown services, replacement of defective components and systems, void and mutual-exchange checks and emergency and out-of-hours attendance, including 24-hour, 365/366-day services where required. Electrical works and services will include complete and partial rewiring, upgrading, alteration, inspection, testing, certification, Electrical Installation Condition Reports and associated remedial works; consumer units and distribution equipment; RCBOs, RCDs/RCCBs, AFDDs and surge protection devices; main service intake works and associated DNO requirements; earthing and bonding; power, lighting and final circuits; sockets, switches and appliance supplies; immersion heaters; electric showers; connections to heating and boiler systems; external and communal/landlord lighting; supplies to outbuildings and external stores; extract fans and ventilation-related electrical works; doorbells; TV aerial cabling and outlets; photocells, time switches and lighting controls; and associated electrical equipment and systems. The electrical scope will also include domestic fire detection and smoke, heat and carbon-monoxide alarm systems and associated equipment, including interconnection and radio-frequency equipment, together with servicing, maintenance and responsive repair of electric heating installations and 24-hour breakdown provision. Electric vehicle charging infrastructure may be supplied and installed, including associated equipment and services required to provide fully operational charging installations. Mechanical works and services will include mechanical ventilation with heat recovery systems and associated equipment, thermostatic mixing valves, boosted cold-water pump installations and other mechanical equipment associated with heating, hot water, ventilation and energy systems, including servicing and maintenance where required. The decarbonisation and energy scope will include solar photovoltaic systems and associated services, including inverters, controls, metering, monitoring and battery storage systems, together with solar thermal, air source heat pumps, ground source heat pumps, solar-assisted heat pumps, biomass, CHP/micro-CHP, heat networks, wind turbines, mechanical ventilation with heat recovery, smart heating controls, sensors and monitoring equipment and other emerging renewable, low-carbon and energy-efficiency technologies associated with the heating, electrical, mechanical and decarbonisation scope that may be required during the life of the framework. The framework may support retrofit, decarbonisation, ventilation, overheating, indoor-air-quality, EPC improvement, net-zero and future energy-performance requirements, including requirements arising from grant-funded programmes. Retrofit assessment, energy and technical support services may include pre- and post-works Energy Performance Certificates, energy assessments, SAP10 assessments, retrofit assessments, retrofit coordination, retrofit design, PAS 2035 site visits, air-pressure testing, technical monitoring and cavity-wall borescope services, together with associated services. Legionella risk assessments may also be instructed where required in connection with the works and systems covered by the framework. Project management services may be provided for heating, electrical, mechanical, retrofit and decarbonisation programmes, including grant-funded programmes, and may include management and coordination of the appointed supplier's own works and/or coordination of works delivered in collaboration with other framework suppliers. Requirements may be delivered as individual property works, grouped schemes, planned programmes, servicing and compliance programmes, responsive repairs, emergency works, grant-funded projects and larger retrofit or decarbonisation programmes, together with associated services. The framework is intended to remain sufficiently flexible to respond to changes in legislation, technical standards, funding requirements and technology during its term, including the introduction of emerging renewable and energy-efficiency measures falling within the heating, electrical, mechanical and decarbonisation scope. Suppliers appointed to the framework, either directly or through their declared supply chain, will be required to have the capability to deliver the overall range of works and services included within the scope.

Context for bidders

We hold 2 notices from EASTERN PROCUREMENT LIMITED, going back to September 20262 of them still open. They buy mostly in Climate, Resilience & Disaster Risk and Energy & Power. There are 82 open Energy & Power tenders in United Kingdom. This one closes in 40 days.

Documents

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Energy & Power tenders

All Energy & Power tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →