FreeTender
Accepting bidsitbFrance

France – Engineering studies – Mission complète de Maîtrise d'oeuvre VRD et ouvrage d'art Zone d'activités d'Ussac-Donzenac

Issued by Communauté d'agglomération du bassin de Brive · via TED — Tenders Electronic Daily (EU)

Published
22 Aug 2026
Closes
28 Aug 2026, 23:59 UTC
Reference
470147-2026
Location
France
Sector
Construction & Infrastructure
Type
services

Details

Phase 1 Etudes Préliminaires (EP) Phase 2 AVP Phase 3 PA Phase 4 PRO Phase 5 ACT Phase 6 VISA Phase 7 DET Phase 8 OPC Phase 9 AOR (yc GPA) Enveloppe prévisionnelle travaux : 6 400 000 euro(s) HT

Lots Lot 1 — Mission complète de Maîtrise d'oeuvre VRD et ouvrage d'art Zone d'activités d'Ussac-Donzenac: Phase 1 Etudes Préliminaires (EP) Phase 2 AVP Phase 3 PA Phase 4 PRO Phase 5 ACT Phase 6 VISA Phase 7 DET Phase 8 OPC Phase 9 AOR (yc GPA) Enveloppe prévisionnelle travaux : 6 400 000 euro(s) HT

Buyer: Communauté d'agglomération du bassin de Brive

Buyer country: FRA

Procedure: open

CPV code: 71335000

Full notice, tender documents and how to bid are on the official TED page (link above).

Context for bidders

Communauté d'agglomération du bassin de Brive has 1 open notice on FreeTender. There are 45 open Construction & Infrastructure tenders in France. This one closes in 7 days.

Documents

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →