MEJORAMIENTO Y CONSTRUCCIÓN DE INFRAESTRUCTURA FÍSICA EN SEDES EDUCATIVAS RURALES DEL MUNICIPIO DE ARATOCA; SANTANDER (Manifestación de interés (Menor Cuantía))
Construction and installation of decorative figures and elements for the Christmas Lighting in the Municipal Head Park and in the Campoalegre Park; Rural Area of the Municipality of La HabanaEnglish, machine translated
Issued by ALCALDIA MUNICIPAL DE ARATOCA · via Colombia — SECOP II (Procesos de Contratación)
- Published
- 29 Oct 2026
- Closes
- 10 Nov 2026, 05:00 UTC
- Value
- COP 199,999,759
- Reference
- SAMC-011-2026 (Manifestación de interés (Menor Cuantía))
- Location
- Aratoca, Santander, Colombia
- Sector
- Construction & Infrastructure
- Type
- Obra
This notice was amended 127 times
Details changed after publication. Re-check the official notice before bidding.
- Estimated value changed from 2,643,599,694 to 199,999,759First seen by FreeTender on 1 Nov 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 6 Nov 2026, 05:00 UTC to 10 Nov 2026, 05:00 UTCFirst seen by FreeTender on 1 Nov 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 270,000,000 to 2,643,599,694First seen by FreeTender on 30 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 30 Oct 2026, 05:00 UTC to 6 Nov 2026, 05:00 UTCFirst seen by FreeTender on 30 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 361,105,089 to 270,000,000First seen by FreeTender on 29 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 270,000,000 to 361,105,089First seen by FreeTender on 29 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 361,105,089 to 270,000,000First seen by FreeTender on 29 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 270,000,000 to 361,105,089First seen by FreeTender on 29 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 361,105,089 to 270,000,000First seen by FreeTender on 29 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 270,000,000 to 361,105,089First seen by FreeTender on 29 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 361,105,089 to 270,000,000First seen by FreeTender on 29 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 270,000,000 to 361,105,089First seen by FreeTender on 29 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 220,507,786 to 270,000,000First seen by FreeTender on 27 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 22 Oct 2026, 05:00 UTC to 30 Oct 2026, 05:00 UTCFirst seen by FreeTender on 27 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 160,000,000 to 220,507,786First seen by FreeTender on 17 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 16 Oct 2026, 05:00 UTC to 22 Oct 2026, 05:00 UTCFirst seen by FreeTender on 17 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 510,931,071 to 160,000,000First seen by FreeTender on 13 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 15 Oct 2026, 05:00 UTC to 16 Oct 2026, 05:00 UTCFirst seen by FreeTender on 13 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 160,000,000 to 510,931,071First seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 16 Oct 2026, 05:00 UTC to 15 Oct 2026, 05:00 UTCFirst seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 510,931,071 to 160,000,000First seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 15 Oct 2026, 05:00 UTC to 16 Oct 2026, 05:00 UTCFirst seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 160,000,000 to 510,931,071First seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 16 Oct 2026, 05:00 UTC to 15 Oct 2026, 05:00 UTCFirst seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 510,931,071 to 160,000,000First seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 15 Oct 2026, 05:00 UTC to 16 Oct 2026, 05:00 UTCFirst seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 160,000,000 to 510,931,071First seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 16 Oct 2026, 05:00 UTC to 15 Oct 2026, 05:00 UTCFirst seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 510,931,071 to 160,000,000First seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 15 Oct 2026, 05:00 UTC to 16 Oct 2026, 05:00 UTCFirst seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 160,000,000 to 510,931,071First seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 16 Oct 2026, 05:00 UTC to 15 Oct 2026, 05:00 UTCFirst seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 510,931,071 to 160,000,000First seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 15 Oct 2026, 05:00 UTC to 16 Oct 2026, 05:00 UTCFirst seen by FreeTender on 12 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 160,000,000 to 510,931,071First seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 16 Oct 2026, 05:00 UTC to 15 Oct 2026, 05:00 UTCFirst seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 510,931,071 to 160,000,000First seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 15 Oct 2026, 05:00 UTC to 16 Oct 2026, 05:00 UTCFirst seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 160,000,000 to 510,931,071First seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 16 Oct 2026, 05:00 UTC to 15 Oct 2026, 05:00 UTCFirst seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 510,931,071 to 160,000,000First seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 15 Oct 2026, 05:00 UTC to 16 Oct 2026, 05:00 UTCFirst seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 160,000,000 to 510,931,071First seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 16 Oct 2026, 05:00 UTC to 15 Oct 2026, 05:00 UTCFirst seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 510,931,071 to 160,000,000First seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 15 Oct 2026, 05:00 UTC to 16 Oct 2026, 05:00 UTCFirst seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 160,000,000 to 510,931,071First seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 16 Oct 2026, 05:00 UTC to 15 Oct 2026, 05:00 UTCFirst seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 299,925,455 to 160,000,000First seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 13 Oct 2026, 05:00 UTC to 16 Oct 2026, 05:00 UTCFirst seen by FreeTender on 11 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 267,684,630 to 299,925,455First seen by FreeTender on 8 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 13 Oct 2026, 05:00 UTCFirst seen by FreeTender on 8 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 267,684,630First seen by FreeTender on 8 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 8 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 267,684,630 to 479,976,073First seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 267,684,630First seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 267,684,630 to 479,976,073First seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 267,684,630First seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 267,684,630 to 479,976,073First seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 267,684,630First seen by FreeTender on 7 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 267,684,630 to 479,976,073First seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 267,684,630First seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 267,684,630 to 479,976,073First seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 267,684,630First seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 479,976,073First seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 6 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 479,976,073First seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 479,976,073First seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 479,976,073First seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 479,976,073First seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 479,976,073First seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 5 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 479,976,073First seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 479,976,073First seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 479,976,073First seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 479,976,073 to 187,806,326First seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 8 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 479,976,073First seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 8 Oct 2026, 05:00 UTCFirst seen by FreeTender on 4 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 299,999,743 to 187,806,326First seen by FreeTender on 3 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 7 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 3 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 187,806,326 to 299,999,743First seen by FreeTender on 3 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 9 Oct 2026, 05:00 UTC to 7 Oct 2026, 05:00 UTCFirst seen by FreeTender on 3 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 299,999,743 to 187,806,326First seen by FreeTender on 3 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 7 Oct 2026, 05:00 UTC to 9 Oct 2026, 05:00 UTCFirst seen by FreeTender on 3 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 299,453,388 to 299,999,743First seen by FreeTender on 3 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 5 Oct 2026, 05:00 UTC to 7 Oct 2026, 05:00 UTCFirst seen by FreeTender on 3 Oct 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 379,580,396 to 299,453,388First seen by FreeTender on 29 Sept 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 25 Sept 2026, 05:00 UTC to 5 Oct 2026, 05:00 UTCFirst seen by FreeTender on 29 Sept 2026 — most portals don’t publish when a corrigendum was issued.
- Estimated value changed from 279,982,840 to 379,580,396First seen by FreeTender on 20 Sept 2026 — most portals don’t publish when a corrigendum was issued.
- Submission deadline changed from 21 Sept 2026, 05:00 UTC to 25 Sept 2026, 05:00 UTCFirst seen by FreeTender on 20 Sept 2026 — most portals don’t publish when a corrigendum was issued.
At a glance
ALCALDIA MUNICIPAL DE ARATOCA in Aratoca, Colombia has published a tender in construction & infrastructure: “MEJORAMIENTO Y CONSTRUCCIÓN DE INFRAESTRUCTURA FÍSICA EN SEDES EDUCATIVAS RURALES DEL MUNICIPIO DE ARATOCA; SANTANDER (Manifestación de interés (Menor Cuantía))”. Submissions close on 10 November 2026, 9 days from today. The stated value is COP 199,999,759. Quote reference SAMC-011-2026 (Manifestación de interés (Menor Cuantía)) in any correspondence with the buyer. FreeTender has recorded 12 notices from this buyer since 2026, 1 of them currently open. There are 114 open construction & infrastructure notices in Colombia on FreeTender. Bids are submitted to the buyer through Colombia — SECOP II (Procesos de Contratación), not through FreeTender.
English summary
Machine translated from Spanish by FreeTender. The original notice below is the binding text.
LUCY, VALLE DEL CAUCA, VIGENCE 2026.
Details
MEJORAMIENTO Y CONSTRUCCIÓN DE INFRAESTRUCTURA FÍSICA EN SEDES EDUCATIVAS RURALES DEL MUNICIPIO DE ARATOCA, SANTANDER
Context for bidders
We hold 12 notices from ALCALDIA MUNICIPAL DE ARATOCA, going back to September 2026 — 1 of them still open. They buy mostly in Construction & Infrastructure, Facility Management & Cleaning and Transport & Logistics. There are 114 open Construction & Infrastructure tenders in Colombia. This one closes in 9 days.
Similar Construction & Infrastructure tenders
- Construcción de red de interconexión eléctrica y acometidas domiciliarias en aras de llevar a cabo proyecto de vivienda en zona urbana del municipio de san andrés de cuerquia· closes 3 Nov
- LP-006-2026 (Presentación de oferta)· closes 6 Nov
- Sip_Evento de Cotización_ Servicios de Apoyo a la Construcción_Llave en Mano· closes 2 Nov
- Contrato de obra para la construcción de los puentes peatonales ubicados en las veredas villa nueva, locutama, cumana alta, la valentina el cobre y mejoramiento de los puentes peatonales de las vereda· closes 13 Nov
- Construcción de Estufas Ecoeficientes para las Familias de la Zona Rural y Otras Medidas de Mitigación al Cambio Climático del Municipio de Cereté; Departamento de Córdoba· closes 27 Nov
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- Water proofing treatment of terrace, replacement of water storage tank & other civil miscellaneous work at TE Masaurhi, Patna BABSNL — Bihar · India
- Provision of repairing of boundary wall, water proofing treatment & misc. civil work in TE campus Rajendra Nagar, Patna-2ND CallBSNL — Bihar · India
- Water proofing treatment of T.E./Admn. Bldg.at Patliputra,Patna.BSNL — Bihar · India
- Reconstruction of damaged boundary wall rest of west side at Telephone Bhawan, R-Block, PatnaBSNL — Bihar · India
- Construction of new parapet wall after demolishing damage parapet wall and related balance repairing works at back side of CTTC bldg. PatnaBSNL — Bihar · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →