FreeTender
Accepting bidstenderUnited States

Fort Lee Vehicle Recovery Range — Construction of Other Non-Building Facilities

Issued by DEPT OF DEFENSE · DEPT OF THE ARMY · USACE · NAD · W2SD ENDIST NORFOLK · via SAM.gov — US federal contract opportunities

Published
25 Aug 2026
Closes
29 Sept 2026, 18:00 UTC
Reference
W9123626BA006
Location
VA, United States
Sector
Construction & Infrastructure

Details

DEPT OF DEFENSE · DEPT OF THE ARMY · USACE · NAD · W2SD ENDIST NORFOLK is soliciting Fort Lee Vehicle Recovery Range — Construction of Other Non-Building Facilities. Solicitation number W9123626BA006. Classified under NAICS 236220 — Commercial and Institutional Building Construction. Product/service code Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES. Place of performance: VA, USA. Responses are due by 29 September 2026 18:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.

Amendment 0005: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0005. This amendment incoporates the correct solicitaion documents dated May 26, 2026 to replace the previous inadvertently issued solicitation documets dated November 2025. This amendment also reopens ProjNet and extends the bid due date and bid opening date. Please see the amendment for the complete summary of change. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.

Context for bidders

We hold 4 notices from DEPT OF DEFENSE · DEPT OF THE ARMY · USACE · NAD · W2SD ENDIST NORFOLK, going back to August 20264 of them still open. They buy mostly in Construction & Infrastructure, Agriculture & Food and Facility Management & Cleaning. There are 704 open Construction & Infrastructure tenders in United States. This one closes in 22 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →