For Conducting Feasibility Study of Dhoingakata Natural Reservoir as a Drinking Water Source in Ukhiya, Cox’s Bazar, Bangladesh.
Issued by UNICEF · via UNGM — UN Global Marketplace
- Published
- 30 Jul 2026
- Closes
- 24 Aug 2026
- Reference
- LRPS-2026-9205374
- Location
- Bangladesh
- Sector
- Financial & Professional Services
Details
TERMS OF REFERENCE FOR INSTITUTIONAL CONTRACT
Title of the assignment
Conducting Feasibility Study of Dhoingakata Natural Reservoir as a Drinking Water Source in Ukhiya, Cox’s Bazar.
Purpose
The purpose of this Terms of Reference (TOR) is to engage a qualified consulting firm to undertake a comprehensive techno-feasibility study and Environmental and Social Impact Assessment (ESIA) for the development of the Dhoingakata Natural Reservoir as a sustainable and climate-resilient drinking water source in Ukhiya, Cox’s Bazar. The study will assess technical, hydrological, environmental, ecological, social, financial, and institutional viability to support the provision of safe and sustainable drinking water for both host communities and Forcibly Displaced Myanmar Nationals (FDMNs). The assignment will further inform infrastructure planning, environmental compliance, ecological conservation, risk mitigation, and long-term sustainable water resource management in the region.
This TOR requires a comprehensive evaluation of the reservoir as a long-term raw water source, including sustainable water abstraction, treatment, transmission, storage, and distribution systems, while ensuring environmental protection, ecological conservation, and adherence to social safeguards.
Location
Dhaka and Ukhiya, Cox’s Bazar
Estimated Duration
Duration: 8 months
Reporting to Technical Supervisor of this assignment
WASH Specialist
1. Background
Cox’s Bazar is facing increasing challenges in ensuring access to sustainable, safe, and climate-resilient drinking water supply for both host communities and Forcibly Displaced Myanmar Nationals (FDMNs). Rapid population growth, prolonged humanitarian pressures, groundwater overextraction, salinity intrusion, deforestation, and climate variability have placed significant stress on existing water resources and WASH infrastructure. In Ukhiya and Teknaf, a heavy reliance on shallow aquifers has resulted in groundwater depletion, with many sources becoming non-functional during extended dry periods.
In response, the Department of Public Health Engineering (DPHE) has identified the Dhoingakata Natural Reservoir in Ukhiya/Teknaf as a potential alternative surface water source. The reservoir is naturally recharged through runoff from surrounding hill catchments and presents an opportunity to transition towards renewable surface water use. Preliminary assessments conducted under the ADB-funded Emergency Assistance Project (EAP) indicate that, with appropriate infrastructure, environmental safeguards, and climate-resilient management approaches, the reservoir could provide a sustainable drinking water source for Rohingya refugees and host communities in Whykong, Unchiprang, and surrounding areas.
The reservoir provides important ecological and socio-economic functions. Its overflow supports local livelihoods, including agriculture and small-scale economic activities, while the surroundings serve as habitat and water access for wildlife such as elephants and deer. Any development for drinking water supply must therefore balance water abstraction with ecological conservation, existing community uses, and environmental sustainability considerations.
Recognizing the urgency need for sustainable alternative water sources in the water-scarce areas of Cox’s Bazar, DPHE formally requested UNICEF’s technical support for environmental and social assessments and surface water supply development, leveraging UNICEF’s expertise in WASH, safeguards, climate-resilient infrastructure, and multi-stakeholder coordination.
In response, UNICEF, under the GoB–UNICEF Climate Resilient WASH Project, will support a comprehensive techno-feasibility and Environmental and Social Impact Assessment (ESIA) of the Dhoingakata Reservoir. The study will evaluate its technical, hydrological, environmental, ecological, social, financial, and institutional viability as a sustainable, climate-resilient water source for vulnerable host and refugee populations in Cox’s Bazar.
2. Objectives, Purpose and Expected Results
The objective of this assignment is to conduct a comprehensive techno-feasibility study and Environmental and Social Impact Assessment (ESIA) of the Dhoingakata Natural Reservoir to determine its viability as a sustainable, climate-resilient, and safe drinking water source for host communities and Forcibly Displaced Myanmar Nationals (FDMNs) in Ukhiya, Cox’s Bazar.
The assignment aims to generate evidence-based technical, environmental, ecological, social, financial, and institutional analyses to support informed decision-making for future surface water investments in water-scarce areas of Cox’s Bazar. The study will assess reservoir hydrology, water quality, climate resilience, ecological sensitivity, infrastructure options, and safeguard requirements, ensuring compliance with national regulations and environmental standards. It will also support the preparation of implementation strategies, environmental clearance processes, and long-term sustainable water resource management.
The assignment is expected to achieve the following results:
A comprehensive feasibility and ESIA study for the Dhoingakata Reservoir, based on a design horizon of at least 20 years
Population projections and water demand analysis were completed.
Reliable technical and hydrological data generated, including High-Resolution Digital Elevation Model (DEM), bathymetric survey, climate analysis, and seasonal water availability;
Technically feasible and climate-resilient options identified for water abstraction, treatment, storage, and distribution;
Capital and operation & maintenance (O&M) costs estimated, with financial sustainability and cost-recovery mechanisms
Institutional and regulatory frameworks reviewed, with recommendations for improved governance and compliance.
Environmental, ecological, and social risks are assessed, with mitigation measures, including conservation and wildlife protection.
Preliminary engineering concepts and cost estimates developed for future investment planning;
Compliance with Department of Environment (DoE) and Bangladesh Forest Department (BFD) requirements supported, including facilitation of statutory clearances; and
Statutory clearances from the DoE and DoF secured for Dhoingakata Natural Reservoir construction as a Drinking Water Source
Evidence-based recommendations provided to strengthen long-term water security and sustainable WASH service
3. Description of Assignment
The assignment will support the DPHE and UNICEF Bangladesh in conducting a comprehensive techno-feasibility and Environmental and Social Impact Assessment (ESIA) of the Dhoingakata Natural Reservoir as a climate-resilient surface water source for host communities and FDMNs. The study will generate the technical, environmental, ecological, social, financial, and institutional evidence required to guide future planning, investment, and implementation of sustainable water supply systems in water-scarce areas of Cox’s Bazar.
3.1 Hydrological, Climate and Water Availability Assessment
Review existing hydrological studies, climatic records, reservoir data, and relevant policies and regulatory documents.
Analyze rainfall, evapotranspiration, seasonal variation, reservoir dynamics, and climate variability to assess long-term water availability.
Conduct water balance and safe yield analysis, supported by hydrological modelling under normal, dry, and extreme climatic conditions.
Develop seasonal water availability scenarios and assess climate resilience of the proposed water supply system.
3.2 Topographic, Bathymetric Survey and DEM Development
Conduct drone-based, topographic, and bathymetric surveys of the reservoir and surrounding areas.
Develop a high-resolution Digital Elevation Model (DEM) by integrating survey datasets.
Perform catchment delineation, drainage analysis, inundation mapping, and reservoir storage assessment.
Prepare water depth, seasonal
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this financial & professional services opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Financial & Professional Services tenders
- Provision of Legal ServicesIFAD
- ACQUISITION DES LOGICIELS POUR LA DREUNDP
- RFP Services - Provision of Evaluation Services to conduct the Mid-Term Evaluation of the Sustainable Urban Integration of Displacement Affected Communities…UNOPS
- Establishment of Long-Term Agreement (LTA) for Outbound and Inbound Telemarketing and Additional Multichannel Communication Services for multiple markets in…UNICEF
- Consultant Services for Works Supervision of Sewerage and Drainage Infrastructure in Dutch Quarter, Sint MaartenUNOPS
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →