Feasibility Study & Detail Designs of 8 (Eight ) Water Supply & Sanitation schemes from existing Boreholes .
Issued by Afar Region RPCU · via World Bank — Procurement Notices
- Published
- 7 Nov 2026
- Closes
- 20 Nov 2026
- Reference
- ET-AFR-RPCU-569660-CS-QCBS
- Location
- Ethiopia
- Sector
- Water & Environment
- Type
- consultancy
At a glance
Afar Region RPCU in Ethiopia has published a call for expressions of interest in water & environment: “Feasibility Study & Detail Designs of 8 (Eight ) Water Supply & Sanitation schemes from existing Boreholes .”. Submissions close on 20 November 2026, 10 days from today. Quote reference ET-AFR-RPCU-569660-CS-QCBS in any correspondence with the buyer. FreeTender has recorded 9 notices from this buyer since 2026, 6 of them currently open. There are 59 open water & environment notices in Ethiopia on FreeTender. Bids are submitted to the buyer through World Bank — Procurement Notices, not through FreeTender.
Key requirements
Taken from the notice by FreeTender. The tender document on the official portal is binding — check it, and any corrigendum, before you bid.
To bid on World Bank-financed
The borrower runs the procurement under the World Bank Procurement Regulations; eligibility and documents are in the borrower's bidding document, not on the World Bank site.
Details
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION) FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA LOWLANDS LIVELIHOOD RESILIENCE PROJECT – PHASE II (LLRP-II)
Credit No.: 7519-ET
Assignment Title: : Feasibility Study & Detail Designs of 8 (Eight ) Water Supply & Sanitation schemes from existing Boreholes
Reference No .: ET-AFR-RPCU-569660-CS-QCBS
The Federal Democratic Republic of Ethiopia has received financing from the World Bank toward the cost of the Lowlands Livelihood Resilience Project – Phase II (LLRP-II), and intends to apply part of the proceeds for consulting services. The consulting services (“the Services”) include : prepare bankable, climate-resilient, technically sound, environmentally sustainable, socially inclusive, and implementation-ready feasibility studies, environmental and social safeguard instruments, detailed engineering designs, cost estimates, and procurement documents for rural water supply and sanitation systems. The Services comprise: surveys, feasibility studies, assessments, engineering designs, environmental and social safeguard instruments, cost estimates, procurement documents, implementation planning, and capacity-building activities necessary to deliver technically sound, economically viable, environmentally sustainable, socially inclusive, climate-resilient, and implementation-ready rural water supply and sanitation systems in the targeted woredas (teru, dubti, afdera, argoba, hadeleela, semurobi) woredas of afar region. The implementation period is three (3) calendar months from the date of commencement. The detailed Terms of Reference (TOR) for the assignment can be obtained at the address given below. The Afar National Regional State, Office of the President, Lowlands Livelihood Resilience Project (LLRP-II) Regional Project Coordination Unit now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.
The shortlisting criteria are:
(a) Core business and years in business: the firm’s core business is in the provision of professional consultancy services related to water supply and sanitation infrastructure development, including planning, feasibility studies, hydrogeological investigations, environmental and social impact assessments, detailed engineering design, preparation of technical specifications, cost estimates, Bills of Quantities (BoQs), and procurement documents. The firm shall have a minimum of five (5) years of relevant experience in providing consultancy services in water supply, sanitation, water resources development, and related infrastructure projects. Experience in rural and multi-village water supply systems, climate-resilient infrastructure.
(b) General experience: he consulting firm shall demonstrate adequate institutional capacity and experience in providing consultancy services related to water supply, sanitation, feasibility studies, environmental and social assessments, detailed engineering design, and preparation of procurement documents. The proposed key experts shall possess the minimum general professional experience specified in the Terms of Reference, ranging from 6 to 12 years, depending on their respective positions. (c) Specific experience: Proven experience in Water Supply Planning and Feasibility Studies, planning and conducting feasibility studies for rural, urban, piped, and multi-village water supply systems., detailed engineering design of water supply infrastructure, including groundwater abstraction, pumping stations, transmission pipelines, storage reservoirs, and distribution networks , hydrogeological investigations, groundwater source assessment, borehole evaluation, pumping-test analysis, and sustainable water-resource development., WASH: planning and designing rural sanitation systems, public sanitation facilities, institutional WASH facilities, preparing Environmental and Social Impact Assessments (ESIA), Environmental and Social Management Plans (ESMP), Resettlement Action Plans (RAP), and other applicable World Bank Environmental and Social Framework (ESF) instruments.. Climate-Resilient Infrastructure: climate-risk assessment and designing climate-resilient water supply and sanitation infrastructure, including solar-powered pumping systems., preparing detailed engineering drawings, technical specifications, Bills of Quantities (BoQs), engineer's cost estimates, experienced in consultancy assignments financed by the World Bank, IFAD, or other international development partners is desirable. (d) Technical and managerial capability of the firm: organizational capacity and experience in managing multidisciplinary consultancy assignments related to rural water supply and sanitation planning, feasibility studies, environmental and social impact assessments, detailed engineering design, and preparation of procurement documents. Availability of qualified technical professionals covering water supply engineering, hydrogeology, hydraulic engineering, civil/structural engineering, sanitation, electromechanical and solar energy systems, geotechnical investigations, surveying, environmental and social safeguards, and cost estimation.
Key Experts will not be evaluated at the shortlisting stage. The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” September 2023 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest. Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. A Con
Context for bidders
We hold 9 notices from Afar Region RPCU, going back to August 2026 — 6 of them still open. They buy mostly in Agriculture & Food, Construction & Infrastructure and Financial & Professional Services. There are 59 open Water & Environment tenders in Ethiopia. This one closes in 10 days.
More from this buyer
- Construction of Poultry multiplication and feed processing centre in Dubti Woreda· closes 7 Dec
- Construction of Liquid Nitrogen Plant in Dubti Woreda· closes 7 Dec
- Construction of Awadi Geberoch diversion irrigation Scheme in Argoba woreda· closes 20 Nov
- procurement of Apiculture accessory and equipment ( Protective Cloth ,Smokers, Knife Wax ,, Beehive Shade ).· closes 16 Nov
- Construction of two Primary Livestock Market centers ( LOT 1 : Dulessa woreda , LOT 2: Megale wreda )· closes 16 Nov
Similar Water & Environment tenders
- Construction of new water supply scheme in Hadiya Zone Analimo woreda Schools Implementing Agency SNNPR Analimo woreda Finance Office.
- Procurement for the construction of Goma water Supply & Sanitation subproject from borehole Water in Meanit Goldia woreda , West Omo Zone.· closes 2 Dec
- Construction of new water supply scheme in Guraghe Zone Endegagn woreda wolecho primary Schools Implementing Agency Endegagn woreda Finance Office.
- Construction of new water supply scheme in Guraghe Zone Endegagn woreda wolecho primary Schools Implementing Agency Endegagn woreda Finance Office.
- Construction of new water supply scheme in Guraghe Zone Endegagn woreda wolecho primary Schools Implementing Agency Endegagn woreda Finance Office.
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this water & environment opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Water & Environment tenders
- Выполнение работ по уничтожению, утилизации (переработке) имущества, обращеннго в собственность государства и иного изъятого имуществаТЕРРИТОРИАЛЬНОЕ УПРАВЛЕНИЕ ФЕДЕРАЛЬНОГО АГЕНТСТВА ПО УПРАВЛЕНИЮ ГОСУДАРСТВЕННЫМ ИМУЩЕСТВОМ В САХАЛИНСКОЙ ОБЛАСТИ · Russia
- Оказание услуг и (или) выполнение работ по капитальному ремонту общего имущества многоквартирного дома по адресу: Кемеровская область – Кузбасс, Юргинский муниципальный округ, д. Талая, ул. зеленая, д. 3, ул. Центральная, 1 (капитальный ремонт крыши); Кемеровская область – Кузбасс, Юргинский муниципальный округ, д. Талая, ул. зеленая, д. 1, с. Поперечное, ул. Строительная, д. 3 (капитальный ремонтУПРАВЛЕНИЕ ПО ОБЕСПЕЧЕНИЮ ЖИЗНЕДЕЯТЕЛЬНОСТИ И СТРОИТЕЛЬСТВУ ЮРГИНСКОГО МУНИЦИПАЛЬНОГО ОКРУГА · Russia
- услуги по вывозу КГО - на основании описания закупки и постановления от 23 декабря 2024 г. № 1875МУНИЦИПАЛЬНОЕ АВТОНОМНОЕ ДОШКОЛЬНОЕ ОБРАЗОВАТЕЛЬНОЕ УЧРЕЖДЕНИЕ "ДЕТСКИЙ САД № 75" ЭНГЕЛЬССКОГО МУНИЦИПАЛЬНОГО РАЙОНА САРАТОВСКОЙ ОБЛАСТИ · Russia
- Assembly and Delivery of Wheeled 240L Blue Bins to Householders Within the MID and East Antrim Borough Council Area (Ballymena and Carrickfergus)Mid and east Antrim Borough Council · United Kingdom
- Victoria Park C Dock ReplacementCity of Belleville · Canada
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →