Feasibility Study and Basic Design for Combined Heat and Power (CHP) Gas Plant and Bitola District Heating Network Expansion
AD Power Plants of North Macedonia
- Published
- 4/8/2026
- Closes
- 10/8/2026, 5:30:00 am
- Bid opening
- —
- Value
- —
- Reference
- MK-ESM-563220-CS-QCBS
- Location
- North Macedonia
- Sector
- Financial & Professional Services
- Type
- consultancy
Details
REQUEST FOR EXPRESSIONS OF INTEREST FOR CONSULTING SERVICES AD Elektrani na Severna Makedonija, vo drzhavna sopstvenost, Skopje - Republic of North Macedonia
Project: Bitola Gas-Fired Combined Heat and Power Plant and District Heating Network Expansion Project
Grant Facility for Project Preparation (GFPP) Grant No.: TF0D2151
Assignment Title: Project Preparation for Bitola Gas-Fired Combined Heat and Power (CHP) Plant and District Heating Network Expansion
Reference No . (as per Procurement Plan): MK-ESM-563220-CS-QCBS
The AD Elektrani na Severna Makedonija, vo drzhavna sopstvenost, Skopje (“Recipient”) has received financing from the World Bank toward the cost of the Bitola Gas-Fired Combined Heat and Power Plant and District Heating Network Expansion Project, and intends to apply part of the proceeds for consulting services. The consulting services (“the Services”) include preparation of the Feasibility studies for the development of the “Bitola Gas-Fired Combined Heat and Power (CHP) Plant and District Heating Network Expansion” Project. It is expected that the commencement of activities by the Consultants for all studies will be at the beginning of year 2027 and is estimated to be completed within 12 months. The Consultant shall mobilize within fifteen (15) working days after Contract signing. The Activities for which the Grant is provided consist of the following parts: Technical and Economic Preparation
Carrying out pre-investment studies to confirm the feasibility of the Project including: (i) a feasibility study and basic design for the Bitola gas-fired CHP plant and its gas pipeline connection (as well as associated facilities such as grid connection), including assessment of optimal capacity, technology options, fuel supply assumptions, heat offtake, and system integration. The feasibility study would assess use of existing infrastructure in Bitola; (ii) a feasibility study and technical designs for the expansion of the Bitola district heating (DH) network, including demand assessment, network routing, phasing, and investment prioritization; and
Environmental and Social Instruments Preparation
Undertaking environmental and social assessments and preparing Project’s environmental and social risks management instruments including Environmental and Social Impact Assessment(s) – ESIA(s) with embedded Environmental and Social Management Plan(s), Resettlement Policy Framework(s) - RPFs/Resettlement Action Plan(s) – RAPs, Labor Management Procedures (LMP) and Stakeholder Engagement Plan(s) – SEPs in accordance with the World Bank requirements. Institutional and Capacity Building Support
Carrying out upstream preparatory work of institutional components of the Project, as well as related workshops and learning exchanges including: capacity building and training activities to enhance ESM’s capacity regarding preparation and implementation of large energy infrastructure projects, including project management, procurement planning, contract management, and environmental and social risks management; institutional strengthening to support financial planning, budgeting, and cost recovery related to CHP and district heating (DH) network
…full terms are in the official tender document.
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this financial & professional services opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Financial & Professional Services tenders
- E-tenders are invited for Empanelment of Electrical Auditors for Electrical Audit of Regional Office & its Branches/Offices falling under Region…Punjab & Sind Bank · India
- LACADS 2025-26 Sri.P A Muhammad Riyas MLA - LACADS 2025-26 Sri.P A Muhammad Riyas MLA - Installation of Low mast light at various places in Beypore Constituency PMC/LIMITED TENDERLocal Self Government Department · Kozhikode · District Panchayath Division Office Kozhikkode · Office of Exec Engg Kozhikkode District panchayath · India
- RfP for Selection of Anchor Inustry Partner (AIP) under PM-SETU SchemeDepartment of Labour · UT of Puducherry SPIU Society · India
- Hiring of Tax Consultants from eligible domestic Chaartered Accountants registered with ICAI for Financial Years 2026-27, 2027-28 and 2028-29.HAUDD · Srinagar Development Authority · India
- Germany – Government services – PolBln 223_26 EU RV Sicherung von GefahrenstellenPolizei Berlin · Germany
Ready to bid? Verify the details and apply on the official tender page.
Verify & apply on the official portal →