Expansion of the Passenger Terminal of the San Salvador International Airport (AIES) San Óscar Arnulfo Romero y Galdámez (SOARG)
Autonomous Executive Port Commission (CEPA)
- Published
- 8/8/2026
- Closes
- 18/8/2026, 2:59:00 am UTC
- Bid opening
- —
- Value
- —
- Reference
- ES-L1173
- Location
- El Salvador
- Sector
- Construction & Infrastructure
- Type
- —
Details
El Salvador, through the Autonomous Executive Port Commission (CEPA), has financing from the Inter-American Development Bank (IDB) through Loan Agreement No. 6073/OC-ES for the "Modernization Program of the International Airport of El Salvador". This Request for Information (RFI) constitutes a prior and non-binding market consultation aimed at gathering inputs for the preparation of future calls for International Public Bidding (IPL) for construction and Quality and Cost Based Selection (QSB) for supervision.
Scope and characteristics of the project Main objective: Functional, architectural and technical expansion of the passenger terminal towards the eastern sector of Stage 1 (AIES III), guaranteeing the operational continuity of the existing infrastructure during the execution of the works.
Distribution of the work (approx. 18,555 m² total):
- Level 1 (5,868 m²): Technical areas, maintenance, ramp support, airline offices, storage and vertical circulation cores for internal logistics assistance.
- Level 2 (7,639 m²): Main boarding operation with six (6) waiting rooms, six (6) departure gates, commercial areas and VIP lounge.
- Level 3 (5,048 m²): Segregation of arrival passenger flows (6 gates for disembarkation), connection with immigration areas, transfer flights and complementary trade.
Technical components and sustainability:
- Incorporation of six (6) boarding bridges (PBBs) connected to the north and south platforms.
- Criteria for universal accessibility and mobility of care.
- Development using the collaborative BIM (Building Information Modeling in 3D) methodology.
Goals for obtaining the EDGE Advanced certification (minimum savings of 40% in energy consumption, 20% in water and 20% in embodied carbon in materials).
Estimated construction time: 24 months.
Requirements and purpose of the market consultation Profile of the firms: Construction companies and supervisory consulting firms with creditable experience in the construction or supervision of airport terminals or expansion works of airports in operation during the last twenty (20) years.
Information to be presented: Technical capacity, previous experience in projects in the airport sector, use of BIM methodology, implementation of sustainability certifications (EDGE or equivalent) and experience under FIDIC contractual modalities.
Projected regulatory framework
Construction: The future selection process will be governed by the IDB's Policies for the Acquisition of Goods and Works (GN-2349-15).
Works supervision: The selection process will be carried out under the SBCC modality in accordance with the IDB's Policies for the Selection and Hiring of Consultants (GN-2350-15).
Note: Consultation documents and supplementary specifications are available in the official language of the country. ElSalvador,throughtheAutonomousExecutivePortCommission(CEPA),hasfinancingfromtheInter-AmericanDevelopmentBank(IDB)throughLoanAgreementNo.6073/OC-ESforthe"ModernizationProgramoftheInternationalAirportofElSalvador".ThisRequestforInformation(RFI)constitutesapriorandnon-bindingmarketconsultationaimedatgatheringinputsforthepreparationoffuturecallsforInternationalPublicBidding(IPL)forconstructionandQualityandCostBasedSelection(QSB)forsupervision.ScopeandcharacteristicsoftheprojectMainobjective:Functional,architecturalandtechnicalexpansionofthepassengerterminaltowardstheeasternsectorofStage1(AIESIII),guaranteeingtheoperationalcontinuityoftheexistinginfrastructureduringtheexecutionoftheworks.Distributionofthework(approx.18,555m²total):-Level1(5,868m²):Technicalareas,maintenance,rampsupport,airlineoffices,storageandverticalcirculationcoresforinternallogisticsassistance.-Level2(7,639m²):Mainboardingoperationwithsix(6)waitingrooms,six(6)departuregates,commercialareasandVIPlounge.-Level3(5,048m²):Segregationofarrivalpassengerflows(6gatesfordisembarkation),connectionwithimmigrationareas,transferflightsandcomplementarytrade.Technicalcomponentsandsustainability:-Incorporationofsix(6)boardingbridges(PBBs)connectedtothenorthandsouthplatforms.-Criteriaforuniversalaccessibilityandmobilityofcare.-DevelopmentusingthecollaborativeBIM(BuildingInformationModelingin3D)methodology.GoalsforobtainingtheEDGEAdvancedcertification(minimumsavingsof40%inenergyconsumption,20%inwaterand20%inembodiedcarboninmaterials).Estimatedconstructiontime:24months.RequirementsandpurposeofthemarketconsultationProfileofthefirms:Constructioncompaniesandsupervisoryconsultingfirmswithcreditableexperienceintheconstructionorsupervisionofairportterminalsorexpansionworksofairportsinoperationduringthelasttwenty(20)years.Informationtobepresented:Technicalcapacity,previousexperienceinprojectsintheairportsector,useofBIMmethodology,implementationofsustainabilitycertifications(EDGEorequivalent)andexperienceunderFIDICcontractualmodalities.ProjectedregulatoryframeworkConstruction:ThefutureselectionprocesswillbegovernedbytheIDB'sPoliciesfortheAcquisitionofGoodsandWorks(GN-2349-15).Workssupervision:TheselectionprocesswillbecarriedoutundertheSBCCmodalityinaccordancewiththeIDB'sPoliciesfortheSelectionandHiringofConsultants(GN-2350-15).Note:Consultationdocumentsandsupplementaryspecificationsareavailableintheofficiallanguageofthecountry.
Executing unit: Autonomous Executive Port Commission (CEPA)
IDB project: ES-L1173
Contact: adquisiciones.pmaies@cepa.gob.sv
Financed by the Inter-American Development Bank (IDB).
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- AMI - Cameroun - Elaboration d’un Plan de Gestion des Pestes (PGP) du projet de construction du barrage de Moundourwan et de son périmètre irrigué dans la localité de Hina, Région de l’Extrême - nordAfrican Development Bank project
- Construction of C.C. road from near the kabristan to Veterinary hospital Office in Ward No. 8 of Nagar Panchayat Nawabganj.Directorate of Local Bodies UP · Nagar Panchayat Nawabganj Unnao · India
- UCCH PRATHAMIK SCHOOL MAI C.C INTERLOCKING LAGANE KA NIRMAN KARYA. DAURALA MEERUTDirectorate of Local Bodies UP · Nagar Panchayat Daurala Meerut · India
- Permanent Restoration of Dev Mohalla Zonreshi RoadPWD · Chief Engineer North Kashmir · Kupwara Circle · Kralpora Division · India
- Rate contract for Tentage Work like Safe House, Dome, Stage etc. Construction including Barricating and Miscellaneous Works while VIP Visits under PWD Division Banswara (PART-II). PWD2627WSOB09040PWD - CE AND AS · ACE-UDAIPUR-II · SE-PRATAPGARH · EE-I-PRATAPGARH · India
Ready to bid? Verify the details and apply on the official tender page.
Verify & apply on the official portal →