Expansion of the high-voltage electricity transmission system under the public works concession regime (Law 17,520) "AMBA I"

Issued by Secretary of Energy · via IDB — BID for the Americas (Inter-American Development Bank)

Published
17 Aug 2026
Closes
10 Dec 2026, 17:00 UTC
Reference
34-0003-LPU26
Location
Argentina
Sector
Energy & Power

Details

The AMBA I project includes the execution and commercial refurbishment of the following infrastructure:

  • ET Plomer 500/220/132 kV
  • LEAT 500 kV Plomer – Ezeiza ET linkage approx. 35 km
  • LEAT 500 kV ET Plomer – ET Atucha linkage, approx. 98 km and EM Atucha extension.
  • 220 kV double tern LAT ET Plomer – ET Zappalorto linkage, approx. 30 km
  • 220 kV double tern LAT ET Plomer – ET Pantanosa, approx. 35 km
  • LAT 132 kV double tern linkage ET Plomer – ET Luján, approx. 21 km
  • Adaptation of the Gral Rodriguez 500/220 kV and Ezeiza 500/220 kV ET
  • Expansion of the 25 de Mayo 500/132 kV power station.
  • Adaptation of the 500 kV LEAT connections to the Ezeiza and Gral Rodríguez ETs.
  • LEAT 500 kV section, approx. 4.5 km for the future connection of LEAT Henderson – ET Ezeiza and ET Ezeiza – ET Gral. Rodríguez 1 and the new ET Henderson – ET Gral Rodríguez 1 Interconnection.
  • LEAT 500 kV section, approx 4.5 km linking LEAT 25 de Mayo – ET Ezeiza and ET Ezeiza – ET Gral Rodríguez 2 and the new ET 25 de Mayo – ET Gral Rodríguez 2 interconnection.

The execution period of the works is 52 months and the operation and maintenance is 15 years.

The project, called "AMBA I", will be financed by private companies under a public works concession scheme.

The Inter-American Development Bank (IDB) is currently preparing a guarantee operation for AMBA in support of this project. Additional information is available in Project Profile https://www.iadb.org/en/project/AR-U0007. BID for the Americas (BIDFA) disseminates information about this opportunity solely as a service to stakeholders. The IDB is not a party to this project, process, or any resulting contract, and assumes no responsibility or liability of any fiduciary, contractual, supervisory, or procurement nature with respect thereto. Any query, presentation or communication related to this opportunity should be directed exclusively to the entity responsible for the project. TheAMBAIprojectincludestheexecutionandcommercialrefurbishmentofthefollowinginfrastructure:·ETPlomer500/220/132kV·LEAT500kVPlomer–EzeizaETlinkageapprox.35km·LEAT500kVETPlomer–ETAtuchalinkage,approx.98kmandEMAtuchaextension.·220kVdoubleternLATETPlomer–ETZappalortolinkage,approx.30km·220kVdoubleternLATETPlomer–ETPantanosa,approx.35km·LAT132kVdoubleternlinkageETPlomer–ETLujan,approx.21km·AdaptationoftheGralRodriguez500/220kVandEzeiza500/220kVET·Expansionofthe25deMayo500/132kVpowerstation.·Adaptationofthe500kVLEATconnectionstotheEzeizaandGralRodriguezETs.·LEAT500kVsection,approx.4.5kmforthefutureconnectionofLEATHenderson–ETEzeizaandETEzeiza–ETGral.Rodriguez1andthenewETHenderson–ETGralRodriguez1Interconnection.·LEAT500kVsection,approx4.5kmlinkingLEAT25deMayo–ETEzeizaandETEzeiza–ETGralRodriguez2andthenewET25deMayo–ETGralRodriguez2interconnection.Theexecutionperiodoftheworksis52monthsandtheoperationandmaintenanceis15years.Theproject,called"AMBAI",willbefinancedbyprivatecompaniesunderapublicworksconcessionscheme.TheInter-AmericanDevelopmentBank(IDB)iscurrentlypreparingaguaranteeoperationforAMBAinsupportofthisproject.AdditionalinformationisavailableinProjectProfile_____(link)_______.IDBfortheAmericas(BIDFA)disseminatesinformationaboutthisopportunitysolelyasaservicetostakeholders.TheIDBisnotapartytothisproject,process,oranyresultingcontract,andassumesnoresponsibilityorliabilityofanyfiduciary,contractual,supervisory,orprocurementnaturewithrespectthereto.Anyquery,presentationorcommunicationrelatedtothisopportunityshouldbedirectedexclusivelytotheentityresponsiblefortheproject.

Executing unit: Secretary of Energy

IDB project: 34-0003-LPU26

Contact: [contact details removed]

Financed by the Inter-American Development Bank (IDB).

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Energy & Power tenders

All Energy & Power tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →