ETH-UNHCR RFP 3329- 4 KM-Road Construction at Luakdong in Gambella region , Ethiopia
Issued by UNHCR · via UNGM — UN Global Marketplace
- Published
- 31 Jul 2026
- Closes
- 13 Aug 2026
- Reference
- UNHCR RFP: 3329
- Location
- Ethiopia
- Sector
- Construction & Infrastructure
Details
4 km road access construction at Luakdong site in Gambella , Ethiopia:
UNHCR is seeking a qualified contractor to construct approximately 4 km of all-weather internal gravel access roads in Luakdong Refugee Settlement, Gambella Region, Ethiopia, including six cross-drainage culverts, side drains, mitre drains, and erosion protection works.
The project aims to improve year-round accessibility, drainage, and flood resilience within the refugee settlement, where seasonal flooding, black cotton soils, and poor drainage often make roads impassable. The contractor will be responsible for all labor, materials, equipment, supervision, testing, and quality control required for the works.
Key requirements include:
Construction of a 7 m wide gravel road with an 80 cm compacted road structure.
Installation of 6 reinforced concrete pipe culverts and associated drainage structures.
Compliance with ERA Road Specifications, UNHCR standards, and Ethiopian regulations.
Completion within 90 calendar days.
Provision of progress reports, as-built documentation, and a 365-day defects liability period.
UNHCR reserves the right to adjust the scope by up to ±30%, with the final road length expected to be between 3 km and 4 km, depending on operational needs and available funding. The project is intended to ensure reliable humanitarian access, support refugee services, and strengthen infrastructure resilience in the settlement.
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- LTA for 2 Years for General Building Maintenance ServicesUNDP
- Provision of design documentation for the Construction of the Elementary school in Blok 35-36 in Podgorica, Montenegro (UNOPS-ESIM-2026-S-005)UNOPS
- RFQ for Construction of Sang-E-Toda Canal through Cash for Work (CFW) in Sang-E-UNDP
- Provision of HVAC, Electromechanical, and Building Utility Systems Maintenance ServicesOPCW
- Completion of Remaining Works under Phase II and Renovation of PremisesOSCE
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →