FreeTender
Accepting bidstenderUnited Kingdom

Escalator Programmable Logic Controllers, Drives, inverters and interfaces

Issued by Transport for London · via UK Find a Tender Service

Published
17 Sept 2026
Closes
23 Oct 2026, 11:00 UTC
Value
GBP 18,061,649
Reference
WS3006219152
Location
United Kingdom
Sector
Energy & Power
Type
goods

Details

Transport for London (TfL), and London Underground Limited (LUL) plan to put a framework in place with two lots: Lot 1 - For the manufacture and supply of new escalator PLCs built to TfL specification as well as the associated field wiring, motor drives and HMI. A priced option including installation will be included. Lot 2 - For the manufacture and supply of drives and inverters required for OPEX maintenance. As part of this Framework tender, TfL also proposes to include the first call-off for Lot one, Piccadilly Circus Escalator programmable Logic controllers - supply and install. TfL requires a framework to commence in late winter/early spring 2027 for an initial duration of five (5) years, with an option to extend by up to three (3) years. Any extension will be applied as two (2) years plus one (1) year. To be added to the event please email: [contact details removed]

Context for bidders

We hold 15 notices from Transport for London, going back to August 202615 of them still open. They buy mostly in Transport & Logistics, Energy & Power and IT & Telecom. There are 78 open Energy & Power tenders in United Kingdom. This one closes in 36 days.

Documents

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Energy & Power tenders

All Energy & Power tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →