Enhancing physical protection of critical infrastructures
Issued by European Commission · via EU Funding & Tenders Portal
- Published
- 25 Sept 2026
- Closes
- 4 Nov 2027
- Reference
- HORIZON-CL3-2027-01-INFRA-01
- Location
- China
- Sector
- Forestry & Wildlife
Details
Expected Outcome:
Project results are expected to contribute to some or all of the following outcomes:
- Critical infrastructure operators and authorities have improved physical risks and hazards assessment capabilities;
- Perimeter security, access control, surveillance systems, remote sensors and other systems used by or relevant to critical infrastructure operators are capable of coping with threats from misuse of new and emerging technologies;
- Improved operational procedures, including incidents management and training curricula, are developed;
- Innovative solutions for critical infrastructure resilience are being developed, utilising recent advancements in spatial planning, security-by-design, preparedness-by-design and nature-based solutions using an inclusive approach that address diverse needs.
Scope:
Physical protection of critical infrastructure should keep up its advancement to match risks and hazards stemming from malicious use of new and emerging technologies, and evolving operational environment, as well as improve its safety and security measures against knowns and emerging threats. Following this approach entities providing essential services should reduce their vulnerability, among others, to threats from improvised explosive devices, ramming attacks, sabotage, uncooperative and hostile unmanned platforms including swarm robotics, penetration of access points by unauthorised individuals and vehicles, unauthorised access to hazardous material storage, removal of critical components, or deterioration of critical infrastructure due to age, inadequate design or changed operational conditions, including climate. Proposals submitted under this topic should identify and analyse possible new challenges for the physical security of the critical entities and develop adequate tools, recommendations, manuals and training programmes for relevant operators and authorities. Where relevant for their scope proposals should utilise the nature-based solutions and respect principles of biodiversity. Furthermore, solutions should take into account interdependencies in the context of supply chains and their impact on physical protection. Coordination among the successful proposals from this topic and projects funded under HORIZON-CL3-2025-01-INFRA-01: Open topic for improved preparedness for, response to and recovery from large-scale disruptions of critical infrastructures and HORIZON-CL3-2025-01-INFRA-02: Open topic for role of the human factor for resilience of European critical entities , should be envisaged in order to avoid duplication, share resources and exploit complementarities and opportunities for increased impact. In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content should be addressed only if relevant in relation to the objectives of the research effort. null Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B.
Submissions open on 05 May 2027.
Part of call HORIZON-CL3-2027-01
Type of action: HORIZON Innovation Actions
Programme period: 2021 - 2027
Priorities: AI, DigitalAgenda
"> General conditions
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
DELETE ME Please add hyperlinks as embedded links where needed (underscored text). Send the call document through the document publication form to receive the hyperlink within 2 business days max. DELETE ME
2. Eligible Countries
described in Annex B of the Work Programme General Annexes. A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide .
3. Other Eligible Conditions
In line with the “ restriction on control in innovation actions in critical technology areas ” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
Subject to restrictions for the protection of European communication networks.
The following additional eligibility conditions apply: This topic requires involvement as beneficiaries of at least 3 relevant practitioners from EU Member States or Associated Countries. Depending on th
Context for bidders
We hold 219 notices from European Commission, going back to August 2026 — 219 of them still open. They buy mostly in Water & Environment, Healthcare & Pharma and IT & Telecom. There is 1 open Forestry & Wildlife tender in China. This one closes in 405 days.
More from this buyer
- European Partnership for Pandemic Preparedness (Phase 2)· closes 13 Apr
- ERA Fellowships· closes 8 Sept
- Increasing the resilience of agriculture in water and nutrient-scarce environments through digital innovations· closes 23 Sept
- Support a Young Cancer Survivor Quality of Life (QoL) research programme by cancer charities and funding agencies· closes 21 Sept
- Hydrogen cities· closes 7 Oct
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this forestry & wildlife opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Forestry & Wildlife tenders
- Exploration Well: Cased hole logging of Section II and Open-Hole Logging of section IIIaKarlsruher Institut für Technologie (KIT) · Germany
- Planting of Polybag raised saplings and Naked root saplings for Beating Up of causalities in different closures of Kandi Range established during 2023-24, 2024-25 and 2025-26 of Kamraj Forest Division under scheme CAMPA-NPVFOREST DEPARTMENT · Chief Conservator Forest(CCF) Kashmir · CF North Circle · Divisonal Forest Officer Kamraj · India
- Polybag raised saplings and Naked root saplings and providing and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks in comptt. 91/NL. in NL Range of Kamraj Forest Division under scheme CAMPA-NPVFOREST DEPARTMENT · Chief Conservator Forest(CCF) Kashmir · CF North Circle · Divisonal Forest Officer Kamraj · India
- Construction of Wooden Foot Bridge at Burzalgoth Kibbar Wildlife Chenab Division Kishtwar for the Year 2026 27FOREST DEPARTMENT · Deptt of Wildlife Protection/ Chief Wildlife Warden · CF (WL)/ Regional Wildlife Warden JAMMU · Wildlife Warden Chenab-Kishtwar · India
- Supply of Tools and MachineriesNorth East Cane and Bamboo Development Council (NECBDC) Burnihat Assam · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →