Early Market Engagement Notice: Baku Metro Expansion Project - Phase II (Green Line)
Issued by AIIB-financed project (Azerbaijan) · via AIIB — Project Procurement Notices
- Published
- 9 Apr 2026
- Reference
- aiib-azerbaijan-baku-metro-expansion-project-phase-ii-green-line-early-market-engagement-notice-april-9-2026
- Location
- Azerbaijan
- Sector
- Water & Environment
Details
INTERNAL. This information is accessible to ADB Management and Staff. It may be shared outside ADB with appropriate permission. NOTICE OF INVITATION TO PARTICIPATE IN EARLY MARKET ENGAGEMENT Baku Metro Expansion Project (BMEP) — Phase II Green Line Extension (AIIB) | Purple Line Extension (ADB)
Employer: Baku Metropolitan Closed Joint-Stock Company (Baku
Metropolitan)
Financing Partners: Asian Infrastructure Investment Bank (AIIB) — Green Line
Extension Asian Development Bank (ADB) — Purple Line Extension
Date of Event: April 30, 2026, at 10:00 (Baku Time, UTC+4)
Format: Virtual Webinar (Microsoft Teams) — link to be provided upon
registration
1. Background
Baku Metropolitan Closed Joint -Stock Company (Baku Metro politan), with the support of the Government of the Republic of Azerbaijan, is implementing the Baku Metro Expansion Project (BMEP) — Phase II. This is one of the most significant urban transport investments in the Caucasus region, with a total estimated project value of approximately USD 1.6 billion, financed by AIIB and ADB in parallel. Phase II involves the construction of two new metro lines in Baku, utilizing deep -level Tunnel Boring Machine (TBM) tunnelling through a dense urban environment:
- Green Line Extension (AIIB): The Green Line Extension (7.0 km, 4 underground stations:
Y-14 to Y-17), to be financed by AIIB — extending metro connectivity to the northwest and central corridors of Baku.
- Purple Line Extension (ADB): The Purple Line Extension (8.2 km, 5 underground stations:
B-5 to B-8), to be financed by ADB — extending metro connectivity along the east–west corridor, connecting major commercial and residential districts. For prospective bidders, it is important to note the following legacy condition on the Green Line: two TBMs from a prior construction attempt are currently located underground. . Additionally, excavation and construction of two of the stations on the Green Line had started and stopped in 2014, leaving the two stations partly constructed. Furthermore, tunnelling works on the Green Line would potentially come in contact with contaminated soil and ground water. It is also to be noted that the construction INTERNAL. This information is accessible to ADB Management and Staff. It may be shared outside ADB with appropriate permission. of two metro lines will exclude signalling and telecommunication systems, which are planned to be implemented under a different project. …
Member: Azerbaijan
Sector: Transport
Notice type: Early Market Engagement Notice
Issue date: April 9, 2026
This notice has closed — what to do next
We hold 7 notices from AIIB-financed project (Azerbaijan), going back to March 2025 — 5 of them still open. They buy mostly in Financial & Professional Services, Construction & Infrastructure and Transport & Logistics. There are 3 open Water & Environment tenders in Azerbaijan.
Open now from this buyer
Open Water & Environment tenders in Azerbaijan
- Consultancy Services for the Preparation of Project-Level Environmental and Social Framework (ESF) Documents for Project Appraisal - Environmental Expert
- Consultancy Services for the Preparation of Project-Level Environmental and Social Framework (ESF) Documents for Project Appraisal - Social Development Expert
Documents
- BMEP-Green-0-Purple-Lines-EME-Notice-rev04-PIU_clean.pdfDownload (pdf)
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this water & environment opportunity. Always verify the details on the official source.
- Confirm the closing date and submission window on the official portal before you start preparing your bid.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Water & Environment tenders
- Civil Works — Repair of broken toilet pipeline and rectification of floor Slope for proper drainage of water at 3rd Floor, Main T.E., Budh Marg, Patna.BSNL — Bihar · India
- Procurement of Waste Collection VehicleUNDP · Philippines
- Hiring of One number air conditioned Car with engine capacity up to 1150 CC for petrol version for the Chief Chemist, STPS, MPPGCL, Sarni on monthly run basis for 2000 KM per month for a period of 24 months.Madhya Pradesh Power Generating Company Limited · Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL · India
- Repair / replace and fixing of sanitary items in staff quarter at Sector 25,27 and 28, Panchkula Extension complete in all respect (A/Mtc. Of PH Services in sector 23 to 28, 31 and 32, Panchkula Extension)Haryana Board Corporation · HUDA · PKL Division II · India
- Development of road, Providing water supply, sewerage, tertiary water, storm water scheme in Sector-27, Pinjore - Kalka, Urban Complex, Panchkula including three year mtc. and defect liability period free of cost.Haryana Board Corporation · HUDA · PKL Division II · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →