FreeTender
Accepting bidsBhutan

Dungmin-Zimzor Water Project (RWSS-Construction of Water Intake Structure, FCR Tank, Tap Stands and HDPE pipelines)

Issued by Ministry of Home Affairs, PemaGatshel, Dzongkhag Administration Pema Gatshel · via Bhutan e-GP — egp.gov.bt

Published
17 Aug 2026
Closes
1 Sept 2026, 09:30 UTC
Reference
PG/ZORIG-04/2026-2027/545
Location
Bhutan
Sector
Water & Environment
Type
works

Details

Dungmin-Zimzor Water Project (RWSS-Construction of Water Intake Structure, FCR Tank, Tap Stands and HDPE pipelines)

Procuring agency: Ministry of Home Affairs, PemaGatshel, Dzongkhag Administration Pema Gatshel. Category: Works (Small). Type/Method: NCB, OTM.

Brief description: 16/08/2026 Construction of Water Intake Structure, 20 m³ FCR Tank, Tap Stands, and providing, laying, testing, and commissioning of HDPE pipelines of 50 mm, 40 mm, 32 mm, and 20 mm diameter from the water source up to individual household connections, including all necessary fittings, excavation, backfilling, and associated works complete as per specifications.

Contract Type: Regular Contract · Procurement Method: Open Tendering Method (OTM) · Source of Funds: Own Fund · Project Name: Not applicable

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this water & environment opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Water & Environment tenders

All Water & Environment tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →