At a glance
Altrad AtkinsRealis Joint Venture (A2R JV) in United Kingdom has published a procurement notice in construction & infrastructure: “DNWP0016 - WAGR Enabling Works and Strip-out - Sellafield - A2R JV”. Submissions close on 3 November 2026, 12 days from today. The stated value is GBP 20,000,000. Quote reference C4N118429487 in any correspondence with the buyer. 2 documents are attached to this notice. FreeTender has recorded 2 notices from this buyer since 2026, 1 of them currently open. There are 479 open construction & infrastructure notices in United Kingdom on FreeTender. Bids are submitted to the buyer through UK Contracts Finder, not through FreeTender.
Details
WAGR Overview and Site Information
The Windscale Advanced Gas-cooled Reactor (WAGR), commissioned in 1962, was the prototype for the UK's second-generation Advanced Gas-cooled Reactor (AGR) fleet. The facility (Building B50), recognised by its distinctive spherical containment shell, was supported by the fuel assembly building (B52) and turbine hall (B55).
Following reactor core dismantling and removal in 2012, the WAGR Complex entered Care and Maintenance (C&M). The facility is now progressing towards its final phase of decommissioning and demolition. Existing records confirm the presence of Low-Level Waste (LLW) and Intermediate-Level Waste (ILW), resulting in ongoing radiological and contamination hazards.
All buildings within the WAGR area are owned by the Remediation operating unit, remain under active surveillance and maintenance, and are classified as Beta Gamma contamination facilities.
Project Scope
The scope comprises enabling, strip-out, waste management and decommissioning support activities across the WAGR facility, alongside support for wider Windscale decommissioning programmes and emergent operational requirements.
Key activities include (see attachment)
- Strip-out Works: Internal and external removal of fixtures, fittings, equipment and non-structural elements to facilitate future decommissioning and demolition activities.
- Radiological Waste Management: Safe handling, removal and management of LLW and ILW in accordance with site requirements.
- Asset Reinstatement: Delivery of asset reinstatement works and provision of SQEP resources to support successful handover.
- Pre-Construction Information (PCI): Support information gathering and site characterisation where existing PCI is insufficient.
- Surveys: Plan and undertake surveys to assess radiological, hazardous and operational conditions in support of future decommissioning works.
- Project Enabling Works: Design, fabricate, trial and implement enabling solutions, equipment and materials to support project delivery.
- Asbestos Management: Planning, sampling, monitoring and licensed asbestos removal where required.
- Procurement: Procurement of materials, equipment and associated quality documentation.
- Waste Management: Sorting, segregation, consolidation and disposal of current and historical wastes, including completion of documentation for transfer to Sellafield Waste Coordinators.
- Emergent Works: Rapid response support to operations and maintenance teams for safety-critical issues.
- Temporary Works: Management, design and construction of temporary works, including scaffolding, enclosures and other supporting structures.
- Decontamination: Decontamination activities to support area declassification and radiological rollback.
- Plant Modifications: Production of Plant Modification Proposals (PMPs) and associated documentation.
- Scaffolding Services: Provision of scaffolding design, supply and installation resources as required.
Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation
https: //www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract. Contract summary Industry - Nuclear reactors - 42151000 - Construction work for nuclear reactors - 45251111 - Nuclear safety services - 98113100 Location of contract Any region Value of contract £10,000,000 to £20,000,000 Procurement reference C4N118429487 Published date 21 October 2026 Closing date 3 November 2026 Closing time 5pm Contract start date 1 April 2027 Contract end date 1 April 2031 Contract type Works Contract is suitable for SMEs? Yes Contract is suitable for VCSEs? No Description WAGR Overview and Site Information
The Windscale Advanced Gas-cooled Reactor (WAGR), commissioned in 1962, was the prototype for the UK's second-generation Advanced Gas-cooled Reactor (AGR) fleet. The facility (Building B50), recognised by its distinctive spherical containment shell, was supported by the fuel assembly building (B52) and turbine hall (B55).
Following reactor core dismantling and removal in 2012, the WAGR Complex entered Care and Maintenance (C&M). The facility is now progressing towards its final phase of decommissioning and demolition. Existing records confirm the presence of Low-Level Waste (LLW) and Intermediate-Level Waste (ILW), resulting in ongoing radiological and contamination hazards.
All buildings within the WAGR area are owned by the Remediation operating unit, remain under active surveillance and maintenance, and are classified as Beta Gamma contamination facilities.
Project Scope
The scope comprises enabling, strip-out, waste management and decommissioning support activities across the WAGR facility, alongside support for wider Windscale decommissioning programmes and emergent operational requirements.
Key activities include (see attachment)
- Strip-out Works: Internal and external removal of fixtures, fittings, equipment and non-structural elements to facilitate future decommissioning and demolition activities.
- Radiological Waste Management: Safe handling, removal and management of LLW and ILW in accordance with site requirements.
- Asset Reinstatement: Delivery of asset reinstatement works and provision of SQEP resources to support successful handover.
- Pre-Construction Information (PCI): Support information gathering and site characterisation where existing PCI is insufficient.
- Surveys: Plan and undertake surveys to assess radiological, hazardous and operational conditions in support of future decommissioning works.
- Project Enabling Works: Design, fabricate, trial and
Context for bidders
We hold 2 notices from Altrad AtkinsRealis Joint Venture (A2R JV), going back to August 2026 — 1 of them still open. There are 479 open Construction & Infrastructure tenders in United Kingdom. This one closes in 12 days.
Similar Construction & Infrastructure tenders
- Public Rights of Way: Supply of Gates & Fittings· closes 20 Nov
- ERCF2509N 05 Waterloo Cottage· closes 19 Nov
- Yorkshire Highway Alliance Road Markings Framework 2026-28· closes 19 Nov
- LBS Glazing Housing & Non-Housing· closes 26 Nov
- Materials Framework· closes 2 Nov
Documents
- documentDownload (text/html)
- documentDownload
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- proposed renovation of njabini marketNyandarua County Government · Kenya
- Текущий ремонт здания ГККП "Ясли-сад "Жұлдыз" ГУ "Отдел образования Мугалжарского района Управления образования Актюбинской области" находящеися по адресу Актюбинская область, Мугалжарский район, г.Эмба, ул. Б. Момышұлы,16ГККП "Ясли-сад "Жұлдыз" ГУ "Отдел образования Мугалжарского района Управления образования Актюбинской области" · Kazakhstan
- Repair and painting of room alloted to SEWA office on 2nd floor in Main T.E Bhagalpur..BSNL — Bihar · India
- Приобретение нежилого зданияГУ "Отдел государственных активов и закупок Шетского района" · Kazakhstan
- Civil Works — Repair and painting of OA head & AGM chambers and staircase upto 1st floor of Telephone bhawan (Admn bldg) Bhagalpur under Bhagalpur B.A.BSNL — Bihar · India