Accepting bidstenderIndia
Dismantling, repairing, overhauling, assembling, alignment checking of primary roll crusher with changing of GM split bush, segment bolts at PCH section of Sawang Washery.
Issued by Central Coalfields Limited · Kathara · via Coal India — coalindiatenders
- Published
- 18 Aug 2026
- Closes
- 28 Aug 2026, 11:00 UTC
- Bid opening
- 29 Aug 2026, 11:00 UTC
- Value
- INR 4,58,239
- Reference
- SGW/KTA/ENM/E-Tender/26-27/17 Date 18.08.2026
- Location
- Coal India (CPSE), India
- Sector
- Energy & Power
Details
- Tender Type
- Open Tender
- Contract Form
- Item Rate
- Tender Category
- Works
- Product Category
- Electrical and Maintenance Works
- EMD
- 5,800
- Period of Work
- 10
- Pre-Bid Meeting
- NA
- Pincode
- 829128
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Energy & Power tenders
- Urgent_ Supply, Installation and Activation of StarLink Mini Devices, in MaribUNDP · Yemen
- SUPPLY OF MANPOWER UNDER SR TO CONSERVATION OF ADINATH JAIN AND AMBIKA DEVI TEMPLE COMPLEX AT RUINED FORT DISTRICT KANGRA (H.P.)Archaeological Survey of India · O/o SA-ASI-Shimla Circle-Shimla · India
- Supply of 48 Cores single Mode Non-Armored Fiber Optic Cables (Total lengh 47,200 M).QatarEnergy · Qatar
- Replacement of the 20 HP Booster Pump at Maurice Nagar Pump House, the 1.5 HP Submersible Pump in the Garden Area of C and E Block, Meghdoot Hostel, and the 1 HP Monoblock Pump at Social Center School, WUS Hostel, including Allied Works, D.U.Delhi University · Central Office - DU · Engineering - DU · India
- Renovation of Conference Hall and rooms of Dy. Secretaries including electric work at Delhi Subordinate Services Selection board under PWD Sub division-3/M2533.Public Works Department · CE/SE/M2-M25 · EE/M251 · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →