Accepting bidstenderIndia
Design, Engineering, Manufacturing, Supply, Supervision for Erection and Commissioning of Belt and Bucket Elevator Assembly for Hbl Sugauli and Lauriya
Issued by HPCL Biofuels Limited · Purchase (Patna) · via eProcurement (NIC) — etenders.gov.in
- Published
- 3 Sept 2026
- Closes
- 23 Sept 2026, 15:00 UTC
- Bid opening
- 24 Sept 2026, 15:00 UTC
- Reference
- HBL/TEN/PUB/26-27/230
- Location
- Central/Multi, India
Details
- Tender Type
- Open Tender
- Contract Form
- Supply
- Tender Category
- Goods
- Product Category
- Miscellaneous Goods
- EMD
- 1,00,000
- Period of Work
- 77
- Pre-Bid Meeting
- NA
- Pincode
- 845453
Context for bidders
We hold 32 notices from HPCL Biofuels Limited · Purchase (Patna), going back to July 2026 — 19 of them still open. They buy mostly in Manufacturing & Supply, Agriculture & Food and Energy & Power. This one closes in 21 days.
More from this buyer
- SUPPLY OF INSTRUMENTATION ITEMS ON DOOR DELIVERY BASIS AT HBL SUGAULI· closes 23 Sept
- DESIGN, ENGINEERING, MANUFACTURING, SUPPLY, OF BIN ACTIVATOR ASSEMBLY FOR HBL SUGAULI AND LAURIYA· closes 23 Sept
- SUPPLY OF DE-NATURANT CROTONALDEHYDE AND DENATONIUM BENZOATE ON DOOR DELIVERY BASIS AT HBL PLANT SUGAULI, EAST CHAMPARAN AND LAURIYA, WEST CHAMPARAN, BIHAR· closes 16 Sept
- SUPPLY OF BUTTERFLY VALVES AND NRVs MAKE CRANE ON DOOR DELIVERY BASIS AT HBL PLANT SUGAULI EAST CHAMPARAN BIHAR· closes 11 Sept
- SUPPLY OF STEAM DRUM LEVEL GAUGE GLASS ON DOOR DELIVERY BASIS AT INTEGRATED HBL PLANT SUGAULI· closes 16 Sept
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →