DC Power Supply — R&D-Physical Science-A RES/Expl DEV
Issued by ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · SLAC Natl Accel Lab -DOE Contractor · via SAM.gov — US federal contract opportunities
- Published
- 19 Nov 2026
- Closes
- 1 Dec 2026, 01:00 UTC
- Reference
- SLAC_369019_DCPowerSupply
- Location
- CA, United States
- Sector
- Manufacturing & Supply
At a glance
ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · SLAC Natl Accel Lab -DOE Contractor in United States has published a tender in manufacturing & supply: “DC Power Supply — R&D-Physical Science-A RES/Expl DEV”. Submissions close on 1 December 2026, 10 days from today. Quote reference SLAC_369019_DCPowerSupply in any correspondence with the buyer. FreeTender has recorded 13 notices from this buyer since 2026, 3 of them currently open. There are 3,310 open manufacturing & supply notices in United States on FreeTender. Bids are submitted to the buyer through SAM.gov — US federal contract opportunities, not through FreeTender.
Key requirements
Taken from the notice by FreeTender. The tender document on the official portal is binding — check it, and any corrigendum, before you bid.
To bid on SAM.gov (US federal)
You need an active SAM.gov entity registration with a Unique Entity ID (UEI) to be awarded a federal contract. Check the set-aside and NAICS size standard before you respond.
Details
ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · SLAC Natl Accel Lab -DOE Contractor is soliciting DC Power Supply — R&D-Physical Science-A RES/Expl DEV. Solicitation number SLAC_369019_DCPowerSupply. Classified under NAICS 3333 — Commercial and Service Industry Machinery Manufacturing. Product/service code AJ12 — R&D-PHYSICAL SCIENCE-A RES/EXPL DEV. Place of performance: CA, USA. Responses are due by 01 December 2026 01:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.
SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions. Please review the requirements and provide your best and final offer for both price and lead-time. The following has been attached for you to complete and review:
- (BAA) Buy American Act Certification
- Representations & Certifications Rider
- Confirm attached SLAC Terms and Conditions are accepted
- Technical Specifications
Requested for Quote:
Modular, remotely controllable DC power supply system for detector electronics
Quantity: 1 EA
Please provide a price and lead time quotation by Monday, November 30, 2026. Technical Evaluation Factors Listed Below:
- Ability to Meet the Technical Requirements: The Offeror’s proposal and supporting technical documentation will be evaluated to confirm compliance with the required detector power-supply specifications listed below.
- Schedule and Delivery Date: The University will evaluate the proposed lead time and delivery schedule against SLAC’s required project schedule. An acceptable lead time is within 30 weeks after issuance of the purchase order.
- Past Performance: The University may evaluate documentation demonstrating prior manufacturing and delivery of similar or comparable equipment. Offerors with no relevant past or present performance history may receive an “Unknown Confidence” rating.
Required item(s) are listed below:
Modular, remotely controllable DC power supply system for detector electronics
Quantity: 1 EA
Technical Requirements:
- Provide stable, low-noise, programmable DC power over at least the 30–60 VDC range.
- Support detector loads requiring up to 13.5 A and approximately 650 W per required output or load group.
- Support multiple independently controllable outputs, with the final number of outputs determined by the detector configuration and support for up to 16 outputs where applicable.
- Outputs shall be electrically isolated/potential-free where required by the detector grounding scheme.
- Provide programmable voltage and current limits, ramp rates, trip thresholds, temperature protection, and configurable fault behavior, including individual-channel and grouped-channel shutdown where needed to protect detector electronics.
- Output noise and ripple shall be sufficiently low for sensitive detector operation. Vendors shall provide guaranteed ripple and noise specifications with measurement conditions.
- Ethernet-based remote monitoring and control are required, including readback of voltage, current, status, fault state, and temperature or over-temperature status.
- A local service/configuration interface is required. Web interface and SNMP support are specifically required for SLAC controls integration.
- The system shall be air-cooled, protected against over-temperature conditions, and suitable for continuous operation at rated load in the intended SLAC installation environment.
- Operate from SLAC-compatible AC mains power, nominally 100–240 VAC, 50/60 Hz, with appropriate power factor correction and compliance with applicable electrical safety and EMC standards.
- The system shall be compatible with standard SLAC rack or detector support installations. Standard 19-inch rack mounting is required if installed in existing SLAC racks.
- A compact form factor, such as 3U height or less and approximately 450 mm depth or less, is preferred unless the final installation envelope requires these limits.
- Vendors shall provide mechanical dimensions, weight, cooling requirements, power input requirements, output connector details, isolation ratings, safety certifications, and remote-control interface documentation.
- Redundant output capability, master-slave or parallel operation for current boosting, extended floating voltage capability, browser-based configuration, SNMP support, and modular field-serviceable architecture are required by the detector configuration.
Source Selection:
Source selection will be conducted using the Lowest Price Technically Acceptable (LPTA) method. Award will be made to the responsible Offeror submitting the lowest-priced offer that is determined technically acceptable in accordance with the stated evaluation factors. Please provide a price and lead time quotation by Monday, November 30, 2026. Is there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions? Buy American Act Certification (BAA) applies as applicable to this procurement. Representations & Certifications Rider is required. Once completed, the Reps and Certs is valid for one year until renewal. If you have already completed one within the year, please disregard. Otherwise, please complete and return. Please include in your proposal the Harmonized Tariff Schedule (HTS Code) and Export Control Classification Number (ECCN), if applicable. Please identify any applicable tariffs, duties, or other import-related charges as separate line items in your quotation. All subcontractors are required to register in the System for Award Management (SAM.gov). If possible, please provide a link to your webpage for a published price list or other information to substantiate the prices quoted. The resulting purchase order will be issued on a fixed-price basis. SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services, as well as any applicable supplemental rider, will be made a part of the resulting order. Please markup the terms and conditions if you wish to negotiate. No markups mean that you accept SLAC Terms and Conditions.
Payment Terms will be NET-30
Domestic Suppliers: Freight terms will be FOB Destination Prepaid and Add.
Foreign Suppliers: Shipment will be made CIP SLAC, Menlo Park, and Duty Unpaid.
You are requested to mark and identify proprietary/confidential information provided in response to the solicitation. Please submit your quotation by Monday, November 30, 2026. Contact me directly with any questions. Ashli Gibson | Procurement Commodities Team BSD Supply Chain Management P: 650-926-3167 E: ashlig@slac.stanford.edu
Context for bidders
We hold 13 notices from ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · SLAC Natl Accel Lab -DOE Contractor, going back to September 2026 — 3 of them still open. They buy mostly in Manufacturing & Supply, Electronics & Semiconductors and Electrical Equipment. There are 3,310 open Manufacturing & Supply tenders in United States. This one closes in 10 days.
More from this buyer
Similar Manufacturing & Supply tenders
- Rotor, MID — 3 each, NSN 1005010590501· closes 1 Dec
- Bushing, Sleeve — 3 each, NSN 3120016022985· closes 27 Nov
- Wiring Harness, Aircraf — 11 each, NSN 1670016963734· closes 27 Nov
- Clamp, Loop — 8 each, NSN 5340014221762· closes 30 Nov
- Housing, Machine Gun — 20 each, NSN 1005015523908· closes 30 Nov
Explore United States
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this manufacturing & supply opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Manufacturing & Supply tenders
- FCI Atlanta FY2027 2nd Qtr SubsistenceJUSTICE, DEPARTMENT OF · FEDERAL PRISON SYSTEM / BUREAU OF PRISONS · USP ATLANTA · United States
- FCI Atlanta FY2027 2nd Qtr. BREAD, DAIRY AND EGGSJUSTICE, DEPARTMENT OF · FEDERAL PRISON SYSTEM / BUREAU OF PRISONS · USP ATLANTA · United States
- Window Treatment Products and Related ServicesLIBRARY OF CONGRESS · LIBRARY OF CONGRESS · CONTRACTS SERVICES · United States
- Subsistence Requirement - FY27 2nd Quarter - FDC SeaTacJUSTICE, DEPARTMENT OF · FEDERAL PRISON SYSTEM / BUREAU OF PRISONS · FDC SEATAC · United States
- FCI Atlanta FY2027 2nd QTR CertifiedJUSTICE, DEPARTMENT OF · FEDERAL PRISON SYSTEM / BUREAU OF PRISONS · USP ATLANTA · United States
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →