FreeTender
Accepting bidsitbCzechia

Czechia – Wellheads – Synergys Project: Long Lead Items (LLI) - Wellhead and Frac Tree Systems

Issued by Univerzita Karlova · via TED — Tenders Electronic Daily (EU)

Published
5 Oct 2026
Closes
9 Nov 2026, 23:59 UTC
Value
CZK 9,800,000
Reference
684005-2026
Location
Czechia
Sector
Mining & Metals
Type
goods

At a glance

Univerzita Karlova in Czechia has published an invitation to bid in mining & metals: “Czechia – Wellheads – Synergys Project: Long Lead Items (LLI) - Wellhead and Frac Tree Systems”. Submissions close on 9 November 2026, 35 days from today. The stated value is CZK 9,800,000. Quote reference 684005-2026 in any correspondence with the buyer. One document is attached to this notice. FreeTender has recorded 8 notices from this buyer since 2026, 6 of them currently open. There are 9 open mining & metals notices in Czechia on FreeTender. Bids are submitted to the buyer through TED — Tenders Electronic Daily (EU), not through FreeTender.

Details

This public contract concerns the supply of critical Long Lead Items - Wellhead and Frac Tree Systems - together with the related rental of installation tools and provision of installation services necessary for implementation of the SYNERGYS Project involving deep geothermal drilling, as further specified in Part 2 of the Tender Documentation and in the draft Agreement contained in Part 3 of the Tender Documentation, including the Schedules thereto. For more details, please refer to the tender documents.

Lots

Lot 1 — SYNERGYS PROJECT: LONG LEAD ITEMS (LLI) - WELLHEAD AND FRAC TREE SYSTEMS (estimated 9800000)

Buyer: Univerzita Karlova

Buyer country: CZE

Procedure: open

CPV code: 43612400

Full notice, tender documents and how to bid are on the official TED page (link above).

Context for bidders

We hold 8 notices from Univerzita Karlova, going back to September 2026 — 6 of them still open. They buy mostly in IT & Telecom, Mining & Metals and Energy & Power. There are 9 open Mining & Metals tenders in Czechia. This one closes in 35 days.

Documents

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this mining & metals opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Mining & Metals tenders

All Mining & Metals tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →