FreeTender
Accepting bidstenderUnited Kingdom

British Museum Round Reading Room Roof Oculus Works

Issued by British Museum · via UK Find a Tender Service

Published
24 Aug 2026
Closes
5 Oct 2026, 12:00 UTC
Value
GBP 90,00,000
Reference
BM.26.015
Location
United Kingdom
Sector
Construction & Infrastructure
Type
works

Details

Project Overview The British Museum is seeking to appoint a Principal Contractor for a programme of essential roof repair and replacement works to the Grade I listed Round Reading Room, located at the centre of the Museum. Building Context and Heritage Significance The Round Reading Room was designed by Sydney Smirke and completed in 1857. It is a structure of exceptional national heritage significance, combining iron primary construction with brick masonry, a copper-clad dome, and a fully glazed central lantern. The roofscape comprises three elements: a perimeter flat roof known as the Snow Gallery Roof; the copper dome in batten-roll standing seam; and a twenty-sided glazed lantern incorporating patent glazing, timber sidelights, and a decorative internal laylight.

Scope of Works

The works span four principal areas:

  • Snow Gallery Roof: Removal of an existing membrane and mineral wool flat roof build-up down to the concrete deck. Installation of a warm roof with cold-applied liquid waterproofing membrane, including upstands, penetrations, and new lightning protection.
  • Copper Dome Conservation and Repair: Close-quarters condition survey and conservation-led repair from temporary scaffold, including localised copper panel replacement, seam and flashing repairs, and full replacement of the lantern base apron. Works must be undertaken by heritage-accredited metal roofing specialists.
  • Lantern Glazing, Windows and Refurbishment: Full replacement of the existing patent-glazed lantern atop the dome with a bespoke tiered steel glazing bar system; repair and redecoration of external windows and internal sliding sashes; installation of BMS-linked actuators; and in-situ conservation of the historic internal laylight.
  • Maintenance Access and MEP: Upgrade of permanent access provisions including fall-arrest and restraint systems, internal walkway refurbishment, replacement heating, LED lighting, and BMS integration.

The project includes a number of CDP items, including, but not limited to, scaffold and temporary works, tiered patent glazing, access systems and MEP systems. Key Project Constraints

  • Access and Logistics: The site is entirely enclosed within the Foster+Partners Great Court roof, with no direct external crane access, and the Round Reading Room is to remain open to staff and the public for the maximum time possible during the works. A Stage 4 design for a cable-restrained scaffold system and temporary roof has been developed by an access specialist and needs to be completed as a CDP item, alongside a full lifting, logistics and evacuation strategy.
  • Operational Environment: Although temporary periods of closure and exclusion will be possible in the Round Reading Room, the Museum will remain open without restriction throughout the construction period. Noise and vibration limits apply, and protection of the Reading Room interior and collections is mandatory throughout.
  • Hazardous Materials: Asbestos-Containing Materials and lead-based paints are confirmed present within the lantern and on historic ironwork. Safe methods of removal must be provided during the works.

Procurement and Programme The project will be procured via a single-stage traditional tender under a JCT Standard Building Contract 2024 with Contractor's Design Portion. A contractor will be selected on capability, heritage experience, and commercial submission, with appointment aimed for November 2026, a start on site in January 2027 and Practical Completion targeted for Q1 2028. Contractors will be required to demonstrate CDP and construction experience across: conservation of Grade I or II* listed structures; heritage metal roofing; liquid-applied roofing; bespoke patent glazing fabrication; heritage window joinery and ironwork; works within live occupied public buildings; and complex temporary works in constrained environments. Due to the confidential/commercially sensitive nature of information that will be included in the associated tender documents we require that interested suppliers enter into a confidentiality agreement before they are given access to the tender pack. A copy of the confidentiality agreement is available by request via email to [contact details removed]. The terms of the confidentiality agreement are not subject to negotiation.

Context for bidders

British Museum has 1 open notice on FreeTender. There are 147 open Construction & Infrastructure tenders in United Kingdom. This one closes in 42 days.

Documents

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →