FreeTender
Accepting bidseoiRG

Bolivia-Chile Electrical Interconnection Study, Second Phase

Issued by Inter-American Development Bank (IDB) · via IDB — BID for the Americas (Inter-American Development Bank)

Published
24 Aug 2026
Closes
5 Sept 2026, 02:59 UTC
Value
USD 2,78,000
Reference
RG-T4900
Location
RG
Sector
Energy & Power

Details

The Inter-American Development Bank (IDB), in coordination with the energy authorities of Bolivia and Chile, invites consulting firms to submit proposals for the second phase of the study of the electrical interconnection between the two countries.

The objective is to evaluate the technical, economic, regulatory and socio-environmental feasibility of energy interconnection in a 20-year analysis horizon, quantifying the joint and individual benefits for both electricity systems.

1. Technical scope and central objectives

Energy modeling (SDDP and PowerFactory): Simulate the multi-nodal and multi-reservoir operation of both countries under isolated and interconnected modalities. For Chile, the ≥200 kV" transmission network will be modeled and for Bolivia the ≥69" kV network. Selection of alternatives: Evaluate at least six (6) route and infrastructure options – including Back-to-Back direct current technology – considering technical, economic, territorial and socio-environmental impact criteria. Regulatory and legal framework: Analyze the legislation in force in Chile and Bolivia to propose the legal instruments and network code adjustments necessary to enable the commercial exchange of energy.

2. Key activities and evaluation of the project

Complementarity and supply/demand analysis: Evaluate the integration of renewable resources (solar, wind, hydro) and load profiles to select the three (3) best interconnection alternatives. Conceptual design and grid stability: Define the transmission capacity, compensation requirements, CapEx/OpEx estimation, and evaluate the contribution of the interconnection to resilience, systemic inertia and voltage/frequency control in the face of major contingencies. Multi-criteria evaluation and economic model: Quantify operational savings, GHG emission reductions, and congestion rents through cost-benefit, financial, and sensitivity analyses.

Roadmap and implementation: Formulate an action plan to guide the regulatory, environmental, social, and technical steps required for project execution.

3. Expected inputs and outputs

Unified databases: Simulation files validated in SDDP and PowerFactory, along with editable spreadsheets and methodological documentation.

Conceptual design and multi-criteria matrix: Technical specifications of the infrastructure, cost estimate by country and comparative feasibility report.

Regulatory Report and Roadmap: Diagnosis of the binational legal framework and strategic implementation plan phase by phase.

Note: Interested companies should review the requirements on the BEO Bidder Portal. TheInter-AmericanDevelopmentBank(IDB),incoordinationwiththeenergyauthoritiesofBoliviaandChile,invitesconsultingfirmstosubmitproposalsforthesecondphaseofthestudyoftheelectricalinterconnectionbetweenthetwocountries.Theobjectiveistoevaluatethetechnical,economic,regulatoryandsocio-environmentalfeasibilityofenergyinterconnectionina20-yearanalysishorizon,quantifyingthejointandindividualbenefitsforbothelectricitysystems.1.TechnicalscopeandcentralobjectivesEnergymodeling(SDDPandPowerFactory):Simulatethemulti-nodalandmulti-reservoiroperationofbothcountriesunderisolatedandinterconnectedmodalities.ForChile,the≥200kV"transmissionnetworkwillbemodeledandforBoliviathe≥69"kVnetwork.Selectionofalternatives:Evaluateatleastsix(6)routeandinfrastructureoptions–includingBack-to-Backdirectcurrenttechnology–consideringtechnical,economic,territorialandsocio-environmentalimpactcriteria.Regulatoryandlegalframework:AnalyzethelegislationinforceinChileandBoliviatoproposethelegalinstrumentsandnetworkcodeadjustmentsnecessarytoenablethecommercialexchangeofenergy.2.KeyactivitiesandevaluationoftheprojectComplementarityandsupply/demandanalysis:Evaluatetheintegrationofrenewableresources(solar,wind,hydro)andloadprofilestoselectthethree(3)bestinterconnectionalternatives.Conceptualdesignandgridstability:Definethetransmissioncapacity,compensationrequirements,CapEx/OpExestimation,andevaluatethecontributionoftheinterconnectiontoresilience,systemicinertiaandvoltage/frequencycontrolinthefaceofmajorcontingencies.Multi-criteriaevaluationandeconomicmodel:Quantifyoperationalsavings,GHGemissionreductions,andcongestionrentsthroughcost-benefit,financial,andsensitivityanalyses.Roadmapandimplementation:Formulateanactionplantoguidetheregulatory,environmental,social,andtechnicalstepsrequiredforprojectexecution.3.ExpectedinputsandoutputsUnifieddatabases:SimulationfilesvalidatedinSDDPandPowerFactory,alongwitheditablespreadsheetsandmethodologicaldocumentation.Conceptualdesignandmulti-criteriamatrix:Technicalspecificationsoftheinfrastructure,costestimatebycountryandcomparativefeasibilityreport.RegulatoryReportandRoadmap:Diagnosisofthebinationallegalframeworkandstrategicimplementationplanphasebyphase.Note:InterestedcompaniesshouldreviewtherequirementsontheBEOBidderPortal.

Executing unit: Inter-American Development Bank (IDB)

IDB project: RG-T4900

Contact: [contact details removed]

Financed by the Inter-American Development Bank (IDB).

Context for bidders

Inter-American Development Bank (IDB) has 18 open notices on FreeTender. There is 1 open Energy & Power tender in RG. This one closes in 12 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Energy & Power tenders

All Energy & Power tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →