BMS/ITM/SIS REQ0179648- UNDP Senegal- Public Electric Vehicle Charging Hub
Issued by UNDP · via UNGM — UN Global Marketplace
- Published
- 24 Aug 2026
- Closes
- 16 Sept 2026
- Reference
- UNDP-HQ-02293
- Location
- Denmark
- Sector
- Energy & Power
Details
The UNDP Senegal Country Office, in collaboration with the UNDP ITM Green Energy Team, the Société Nationale dÉlectricité du Sénégal (SENELEC) and the Société Nationale de Gestion du Patrimoine du Train Express Régional (SENTER), has initiated the development of a public electric vehicle charging hub. The proposed solution comprises four (4) DC fast chargers and two (2) AC chargers together with corresponding works and services. The project will contribute to the UN Sustainable Development Goals and serve as a demonstrative smart energy solution with potential for local replication. The objective of this project is to deliver a reliable, cost-effective, and intelligent charging hub with integrated smart facility features. As the installation is intended to serve as a national and international showcase, UNDP ITM requires high standards of quality, performance, safety, and aesthetics. This document defines the site-specific information, minimum technical requirements, and installation standards for the project.
The bidder shall submit a comprehensive proposal for a turnkey electric vehicle charging hub based on the following scope of work: Supply and delivery of four (4) DC fast chargers and two (2) AC chargers Lot 1 – Four (4) DC fast chargers with a minimum 60 kW per charging station ; Lot 2 – Four (4) DC fast chargers with a minimum 100 kW per charging station;
Two (2) AC charging stations with a minimum rated power of 22 kW each.
Installation, User Acceptance Test (UAT), and Commissioning of the complete solution Integration of the complete solution into the SENELEC network Provision of bi-annual preventive maintenance visits and after-sales service by the local partner for 1 year , resulting in a total of two (2) visits annually . Training of the SENELEC operators and SENTER/SETER team on system operation and maintenance to ensure knowledge transfer continuity after the first year of after-sales services provision.
The procurement includes two alternative configurations for the DC charging infrastructure:
Lot 1: Four (4) DC fast charging stations with a minimum rated output power of 60 kW per charging station; or
Lot 2: Four (4) DC fast charging stations with a minimum rated output power of 100 kW per charging station.
The two lots represent alternative technical configurations for the same charging hub and are not cumulative . Only one of the two DC charger configurations will be selected for contract award.
Bidders may submit proposals for one or both lots . Where a bidder submits proposals for both lots, the technical and financial offer for each lot shall be clearly identified and separately priced.
The two (2) AC chargers and all associated installation, commissioning, monitoring, training, warranty, and after-sales service requirements are common to both configurations unless otherwise stated .
------------------------------------
Important dates for this tender
Confirmation of participation in Site Visit and Bidders Conference: September 1st by 12:00 GMT (Dakar time zone)
Pre-Bid Site Visit: September 2nd at 10:00 GMT (Dakar time zone)
Bidders’ Conference: September 4th at 10:00 GMT (Dakar time zone)
Request for Clarification: September 11th by COB GMT (Dakar time zone)
Offer Submission: September 16th at 17:00 GMT (Dakar time zone)
Kindly review the attached Schedule of Requirements for all information regarding this tender. Evaluation will be done on a PASS/FAIL basis. Bidders must be available for clarifications in case there are questions related to the documents submitted. In case of a FAIL on a specific requirement below or in the SoR, the bid will be considered non-compliant.
Please indicate whether you intend to submit a bid by creating a draft response without submitting directly in the system. This will enable the system to send notifications in case of amendments of the tender requirements. Should you require further clarifications, kindly communicate using the messaging functionality in the system. Offers must be submitted directly in the system following this link: using the profile you may have in the portal. In case you have never registered before, you can register a profile using the registration link shared via the procurement notice and following the instructions in guides available in UNDP website: https://www.undp.org/procurement/business/resources-for-bidders . Do not create a new profile if you already have one. Use the forgotten password feature in case you do not remember the password or the username from previous registration .
Context for bidders
UNDP has 510 open notices on FreeTender. There are 3 open Energy & Power tenders in Denmark. This one closes in 22 days.
More from this buyer
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Energy & Power tenders
- Construction Solar Powered Standalone DW facility with Ordex System at No.2 Amlaiguri AC 128531919 under the Award of 15th FC Tied Grant for the year 2025-26 during 2026-27.Bodoland Territorial Council · Panchayat and Rural Development-BTC · India
- AMC of 14 Nos. OTIS make lifts installed in Type-II, III, IV residential quarters, Shekhawat Complex and 08 Nos. Johnson make lifts (580 Men Barrack and OTA building) under MMC-II for the year 2026-27 at NSG Camp Manesar (SH AMC of 06 Nos. PassengerDG,National Security Guard,MHA · Construction Squadron,NSG,MHA · India
- Purchase of fabricated 80 mm dia double flange GI pipe for various Tubewell in Patparganj Constituency AC-57Delhi Jal Board · Delhi Jal Board · EE (E and M) M-13 · India
- ANNUAL RATE CONTRACT FOR ELECTRICAL MAINTENANCE JOB AT WBPDCL MINING OFFICE AND GUEST HOUSE AT DURGAPUR FOR TWO YEARSTHE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. · CORPORATE OFFICE · India
- Supply, Installation and Electrical Fit-Out of 20 Container Shops, BamyanUN-Women · Afghanistan
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →