Autonomous Kitchen – Robotics-as-a-Service (RaaS) -Month To Month Lease- Location: South Korea
Issued by DEPT OF DEFENSE · DEPT OF THE ARMY · AMC · ACC · ACC-OO · 411TH CSB · 0906 AQ CO DET A CONTRACTI · via SAM.gov — US federal contract opportunities
- Published
- 24 Sept 2026
- Closes
- 15 Oct 2026, 01:00 UTC
- Reference
- W90VN926QA065
- Location
- South Korea
- Sector
- Manufacturing & Supply
Details
DEPT OF DEFENSE · DEPT OF THE ARMY · AMC · ACC · ACC-OO · 411TH CSB · 0906 AQ CO DET A CONTRACTI is soliciting Autonomous Kitchen – Robotics-as-a-Service (RaaS) -Month To Month Lease- Location: South Korea. Solicitation number W90VN926QA065. Classified under NAICS 423830 — Industrial Machinery and Equipment Merchant Wholesalers. Product/service code W099 — LEASE-RENT OF MISC EQ. Responses are due by 15 October 2026 01:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.
Solicitation Number: W90VN926QA065
******Amendment Number: 0002. Effective Date: 24 September 2026
A. PURPOSE OF AMENDMENT. The purpose of this amendment is to clarify the evaluation methodology for Factor 1 – Technical Capability under the Addendum to FAR 52.212-2 (Evaluation—Commercial Products and Commercial Services), specifically paragraph 18.2. This amendment does not change the closing date and time for receipt of quotations, does not change the Performance Work Statement or Technical Exhibit 1, and does not change any other evaluation factor. B. DESCRIPTION OF CHANGE — PARAGRAPH 18.2. Paragraph 18.2 of the Addendum to FAR 52.212-2 is revised in its entirety to clarify that Factor 1 – Technical Capability is evaluated on an Acceptable or Unacceptable basis as a whole. The five technical elements listed in paragraph 18.4 are considered collectively under a single overall Factor 1 rating. The revised language reads as follows: 18.2 Acceptable / Unacceptable Determination (Factor 1 as a Whole) The Government will evaluate Factor 1 – Technical Capability on an Acceptable or Unacceptable basis as a whole. The technical elements listed in paragraph 18.4 will be considered collectively. A quotation will be rated Acceptable under Factor 1 if, when considered as a whole, it demonstrates a credible plan and supporting detail showing that the proposed solution meets the minimum requirements of the PWS and Technical Exhibit 1 and can achieve the required outcomes in the ROK / Camp Walker / INDOPACOM environment.A quotation will be rated Unacceptable under Factor 1 if, when considered as a whole, it fails to demonstrate a credible plan or supporting detail for the mandatory requirements, or merely restates the PWS without describing the proposed approach.Only quotations rated Acceptable under Factor 1 will proceed to the comparative evaluation. A quotation rated Unacceptable under Factor 1 will be restricted from further consideration for award. 18.2.1 Rating Scale – Technical Capability Factor. ACCEPTABLE: When considered as a whole, the quotation demonstrates a credible plan and supporting detail showing that the proposed solution meets the minimum requirements of the PWS and Technical Exhibit 1 and can achieve the required outcomes in the ROK / Camp Walker / INDOPACOM environment. Minor weaknesses that do not represent a material risk to successful performance do not require an Unacceptable rating. UNACCEPTABLE: When considered as a whole, the quotation fails to demonstrate a credible plan or supporting detail for the mandatory requirements, or merely restates the PWS without describing the proposed approach. An Unacceptable rating under Factor 1 restricts the quotation from the comparative evaluation. C. RELATED CLARIFICATIONS (1) Paragraph 18.3 is clarified to state that comparative evaluation is conducted among quotations rated Acceptable under Factor 1. (2) Paragraph 18.4 is clarified to state that the technical elements are considered collectively under the Factor 1 rating. (3) No change is made to Factor 2 (Past Performance), Factor 3 (Price), Administrative evaluation, relative order of importance, or any other provision of the solicitation. D. CLOSING DATE AND TIME.The hour and date specified for receipt of quotations is NOT extended by this amendment. Quotations remain due no later than 15 October 2026 at 10:00 AM KST, unless further amended. E. ACKNOWLEDGMENT. Quoters shall acknowledge receipt of this Amendment 0002 in accordance with Item 11 of this SF 30. Failure to acknowledge may result in rejection of the quotation. F. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
G. REFERENCE: 0002. W90VN926QA065_COMBO _Updated_24SEPT26 [PDF]. PREVIOUS IS OBSOLETE. And 0002. SF 30 Soliciation Amendment dated 23 Septemebr 2026.
_______________________________________________________ AMENDMENT 0001. Combined Synopsis /Solicitation Purpose: The purpose of this amendment is to update the final quotation due date and related timelines. -RFQ Closing Date (Quotation Due Date): Quotations are due no later than 15 October 2026 at 10: 00 AM KST. Key Date Reminder
- Site Visit: 29 September 2026 at 13:00 KST
- RFI Deadline: 05 October 2026 at 10:00 AM KST
All other terms and conditions remain unchanged.
Context for bidders
We hold 2 notices from DEPT OF DEFENSE · DEPT OF THE ARMY · AMC · ACC · ACC-OO · 411TH CSB · 0906 AQ CO DET A CONTRACTI, going back to September 2026 — 1 of them still open. There is 1 open Manufacturing & Supply tender in South Korea. This one closes in 15 days.
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this manufacturing & supply opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Manufacturing & Supply tenders
- Fornecimento de CadeirasDIRECCAO PROVINCIAL DE CULTURA E TURISMO DE INHAMBANE · Mozambique
- Repairing of 3 HP monoblock pump sets & 1 Nos 7.5 HP Submersible pump set in TE Bldg BundiBSNL — RAJASTHAN · India
- Химические Насосы EKKF150L-X2-KW, Внимательно Ознакомиться С Технической Спецификацией И Поставка Осуществляется Строго Согласно Технической СпецификацииРГП на ПХВ «Жезказганредмет» КП МПС РК · Kazakhstan
- Вакуум-Насос ВВН 1-25, Внимательно Ознакомиться С Технической Спецификацией И Поставка Осуществляется Строго Согласно Технической СпецификацииРГП на ПХВ «Жезказганредмет» КП МПС РК · Kazakhstan
- Закуп товаров согласно технической спецификации — ШкафАО "НЦН" · Kazakhstan
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →