FreeTender
Accepting bidstenderUnited States

Asbestos Abatement – Building 801, VA Augusta Health Care System

Issued by VETERANS AFFAIRS, DEPARTMENT OF · VETERANS AFFAIRS, DEPARTMENT OF · 247-NETWORK CONTRACT OFFICE 7 (36C247) · via SAM.gov — US federal contract opportunities

Published
14 Sept 2026
Closes
24 Sept 2026, 20:00 UTC
Reference
36C24726Q0749
Location
GA, United States
Sector
Construction & Infrastructure

Details

VETERANS AFFAIRS, DEPARTMENT OF · VETERANS AFFAIRS, DEPARTMENT OF · 247-NETWORK CONTRACT OFFICE 7 (36C247) is soliciting Asbestos Abatement – Building 801, VA Augusta Health Care System. Solicitation number 36C24726Q0749. Classified under NAICS 236220 — Commercial and Institutional Building Construction. Product/service code Z1DA — MAINTENANCE OF HOSPITALS AND INFIRMARIES. Place of performance: GA, USA. Responses are due by 24 September 2026 20:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.

ASBESTOS ABATEMENT – BUILDING 801 Solicitation No. 36C24726Q0749

  • Combined Notice

This notice constitutes a combined synopsis/solicitation for commercial services prepared under FAR Subpart 12.201, This announcement constitutes the only solicitation;    quotations are requested, and no separate written solicitation will be issued. Solicitation 36C24726Q0749 is issued as a Request for Quotations (RFQ). The     solicitation and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01. This combined procedure does not use SF 1449 to issue the solicitation; however, the    resulting award will utilize the SF 1449 format.

  • Acquisition Information
  • Contract Type: Firm-Fixed-Price
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business
  • NAICS Code: 236220
  • Small Business Size Standard: $45.0
  • Product Service Code: Z1DA – Maintenance/Repair/Alteration of Hospitals
  • Place of Performance: VA Augusta Health Care System, Building 801, Augusta GA 30901
  • Period of Performance: Twenty calendar days following issuance of the Notice to Proceed

Eligibility

Only SBA‑certified SDVOSBs listed in the Veteran Small Business Certification (VetCert) database at the time of quotation and at the time of award will be considered eligible.

Pricing Requirements:

Quoted prices must include all labor, supervision, materials, equipment, containment, air monitoring, transportation, disposal, permits, testing, documentation, insurance, overhead, and profit necessary to perform the work.

  • Contract Line Item

0001 Asbestos abatement in Building 801, Rooms 6B-102, 6B-103, 6B-104, 5B-102, and 5B-103, in accordance with the Statement of Work and all solicitation requirements 1 JB $____   $___

  • Description of Requirement

The contractor shall provide all labor, supervision, materials, equipment, transportation,   disposal, testing, documentation, and other resources necessary to remove and properly dispose of approximately 215 square feet of asbestos-containing floor tile and associated mastic located in Building 801, Rooms 6B-102, 6B-103, 6B104, 5B-102, and 5B-103.

Work shall include, at a minimum:

  • Preparation and submission of an acceptable asbestos-abatement work plan;
  • Establishment and maintenance of required regulated work areas and containment;
  • Removal of asbestos-containing floor tile and associated mastic;
  • Air monitoring and clearance testing;
  • Packaging, transportation, and disposal of asbestos-containing waste at an authorized disposal facility;
  • Compliance with applicable Federal, state, local, OSHA, EPA, VA, and facility requirements;
  • Coordination of work, access, shutdowns, and scheduling with the designated VA point of contact; and
  • Restoration and cleaning of affected work areas as required by the Statement of Work.

The contractor shall perform the work in accordance with the attached Statement of  Work, specifications, facility requirements, and all applicable laws and regulations.

  • Place and Schedule of Performance

Performance shall occur at:

VA Augusta Health Care System Building 801 Augusta, Georgia 30901 Normal work hours, advance-notice requirements, access requirements, and any required utility or system shutdown notifications are identified in the Statement of Work. The contractor shall complete all work within 20 calendar days after issuance of the          Notice to Proceed unless otherwise authorized in writing by the Contracting Officer.

  • Site Visit and Questions

NO SITE VISIT IS SCHEDULED. Questions regarding this solicitation shall be submitted in writing to [contact details removed]  no later than 4pm EST 09/17/2026 The Government is not obligated to answer questions received after the deadline. Responses that materially affect the solicitation will be provided by amendment.

  • Quotation Submission Instructions

Quotations shall be submitted electronically to [contact details removed]  no later than:

September 24, 2026, at 4: 00 p.m. Eastern Daylight Time

The email subject line shall identify:

36C24726Q0749 – Asbestos Abatement

Quotations shall include:

  • Company name, address, UEI, CAGE code, and point-of-contact information;
  • Completed CLIN price schedule;
  • A technical narrative demonstrating the quoter’s ability to perform the entire Statement of Work;
  • Identification of required asbestos-abatement licenses, certifications, and qualified personnel;
  • A proposed performance schedule demonstrating completion within the required period;
  • Description of the proposed abatement, containment, air-monitoring, disposal, and clearance-testing approach;
  • Recent and relevant past-performance information for similar asbestos-abatement or hazardous-material work;
  • Identification of proposed subcontractors and the work each subcontractor will perform;
  • Completed VAAR 852.219-75 certification;
  • Acknowledgment of all solicitation amendments; and
  • Any representations or certifications not current in SAM.gov.

Quotations should be concise but contain sufficient information for the Government to evaluate compliance, capability, performance risk, and price. Submission of merely a statement that the quoter will comply, without supporting information demonstrating its capability and approach, may be considered insufficient.

  • Evaluation and Basis for Award

Award will be made to the responsible, eligible SDVOSB whose quotation is most advantageous to the Government using streamlined comparative evaluation under FAR12.203(c)(2).

Evaluation factors:

  • Technical Capability
  • Past Performance
  • Price

No numerical scoring, adjectival ratings, or FAR Part 15 competitive range procedures apply. Factor 1 – Technical Capability The Government will evaluate whether the quotation demonstrates an acceptable understanding of and capability to perform the complete requirement, including:

  • Asbestos-abatement qualifications and licensing;
  • Qualified personnel and supervision;
  • Proposed equipment, containment, and abatement procedures;
  • Air-monitoring and clearance-testing approach;
  • Waste handling, transportation, and disposal;
  • Compliance with applicable safety and facility requirements;
  • Ability to coordinate access, shutdowns, and scheduling; and
  • Ability to complete performance within 20 calendar days after Notice to Proceed.

A quotation that fails to demonstrate the ability to meet a material solicitation requirement may be determined technically unacceptable and ineligible for award. Factor 2 – Past Performance The Government will evaluate recent and relevant past performance involving asbestos  abatement, hazardous-material removal, or work of comparable complexity and risk. The Government may consider information submitted by the quoter and information obtained from CPARS, Government records, references, or other reasonable sources. A quoter without a record of relevant past performance will not be evaluated favorably or  unfavorably solely because of the absence of past-performance information. Factor 3 – Price The Government will evaluate the total quoted price for fairness and reasonableness. The Government may evaluate price using competition, comparison with the Government  estimate, historical pricing, market information, or another method authorized by FAR Part 12. Comparative Selection The Government will perform a direct, side‑by‑side comparison of technically acceptable quotations to identify meaningful differences in capability, performance risk, past performance, and price. The Government will select the quotation that represents the best overall value based on these comparative advantages. Award will not automatically be made to the lowest‑priced technically acceptable quotation. A higher‑priced quotation may be selected if its strengths and lower   performance risk provide value that justifies the additional cost. The Government will not          pay a premium when a higher‑priced quotation does not offer commensurate value. The Contracting Officer will exercise business judgment in determining which quotation is more advantageous to the Government.

The Government reserves the right to:

  • Make award without requesting revisions;
  • Request clarifications from one or more quoters;
  • Reject quotations that fail to meet material requirements;
  • Make no award if it is in the Government’s best interest; and
  • Make award to a single acceptable SDVOSB when only one quotation is received and the price is determined fair and reasonable.
  • Attachments
  • Attachment 1 – SOW – Abatement 6B-102
  • Attachment 2 –Specifications- Abatement 6B102
  • Attachment 3 – Applicable Provisions and Clauses
  • Attachment 4 – GA20260311 Wage Determination
  • Attachment 5- VHA PCRA 2024 1.1
  • Attachment 6- VHA ICRA 1.3 Jan 3, 2025
  • Attachment 7- 2024 ILSM

Context for bidders

We hold 6 notices from VETERANS AFFAIRS, DEPARTMENT OF · VETERANS AFFAIRS, DEPARTMENT OF · 247-NETWORK CONTRACT OFFICE 7 (36C247), going back to September 20265 of them still open. They buy mostly in Construction & Infrastructure, Healthcare & Pharma and Financial & Professional Services. There are 607 open Construction & Infrastructure tenders in United States. This one closes in 10 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →