Anglian Water Fens and Lincolnshire Reservoirs Early Works Partner (EWP)

Issued by Anglian Water Services Ltd · via UK Find a Tender Service

Published
18 Sept 2026
Reference
PPNP-6811-ZVQY
Location
United Kingdom
Sector
Construction & Infrastructure
Type
works

Details

AWS is facing unprecedented challenges due to climate change, population growth and environmental constraints. These challenges include more frequent droughts, increased demand for water, and the need to reduce water abstraction from environmentally sensitive areas. To address these challenges, the Water Resources East regional planning and the Water Resource Management Planning of Anglian Water and Cambridge Water have selected the Fens Reservoirs (FR) and Lincolnshire reservoir (LR) schemes as low-regret Strategic Resource Options (SRO) to improve water security and meet societal and environmental outcomes. The reservoirs will provide safe, resilient supplies of drinking water, as well as environmental, socioeconomic, leisure, and wellbeing benefits for the communities they serve. FR and LR will be delivered to the benefit of both AWS and Cambridge Water (CWC) customers. The FR and LR and associated assets (abstraction, treatment and transfers) are being progressed through the fast-tracked delivery framework overseen by the Regulators' Alliance for Progressing Infrastructure Development (RAPID), and each is proposed to be a Nationally Significant Infrastructure Project (NSIP) seeking consent through the Development Consent Order (DCO) regime. Due to the size and complexity of the programme, Specified Infrastructure Project Regulations (SIPR) is the preferred delivery model for the reservoirs. SIPR was introduced by the UK Government in 2013 as a mechanism for an alternative approach to financing and delivering large and complex water and sewerage infrastructure projects. Under SIPR, the Secretary of State (SoS) or Ofwat (under delegation from the SoS) may specify an infrastructure project for delivery under a "project licence" by a third party where certain conditions are met. Early Works are the preparatory activities; site investigation works and construction tasks to be completed prior to Development Consent Order (DCO) determination and commencement of Enabling Works and Main Construction Works. The works will comprise preparatory statutory, technical, and construction activities required to support the obtaining of the necessary consents prior to DCO determination. Anglian Water are considering the following activities as part of the EWP Framework scope where the EWP will act as the Principal Contractor (PC), where it is reasonably practicable. Principal Contractor Services – Overall site coordination, health and safety management, logistics and contractor management. Duty under CDM. Site Management & Logistics – Site operations, welfare, security, access management and logistics controls. Site Establishment & Compounds – Establishment and operation of site compounds, welfare facilities and supporting infrastructure. Constructability & Design Coordination – Construction planning, buildability reviews and coordination with design development activities. Environmental Mitigation – Delivery of environmental mitigation measures required to support the programme. Ecological Mitigation & Monitoring – Habitat creation, species protection works and ecological monitoring activities. Archaeology, Heritage & Geophysical Investigations – Archaeological investigations, heritage works and geophysical surveys. Water Surveys – Water level and quality monitoring Topographical & Utility Surveys – Topographical surveys, utility detection, mapping and verification activities. Geotechnical Investigations – Ground investigations, testing and reporting. Environmental Surveys – Environmental baseline and compliance surveys. Ecological Surveys – Ecological surveys supporting environmental assessment and mitigation requirements. UXO Investigations – Unexploded ordnance surveys and investigations. Temporary Traffic Management – Temporary traffic management, road closures and associated highway measures. Site Discharge & Consenting Support – Delivery of drainage and discharge infrastructure and support to consent compliance activities. Temporary Works – Design, management and assurance of temporary works. Property Management & Dilapidation Surveys – Property-related activities, condition surveys and management of affected assets and interfaces. Demolition Works – Demolition and clearance of existing structures where required to facilitate delivery of Early Works. Earthworks Trials – A scaled-down embankment constructed to validate ground behaviour, design assumptions, construction methods and specifications before full-scale reservoir embankment delivery. The duration of the Framework is proposed to be an initial 5-year term with a possible extension option. The contracting authority reserves the right, at its sole discretion, to extend the Framework Agreement on up to three occasions with each extension being for a period of 12 months. Accordingly, the maximum duration will be eight years (5 years + 1 year + year + 1 year). We anticipate releasing a Procurement Specific Questionnaire (PSQ) at the beginning of November 2026 with return by the end of November 2026 and launch an ITT January 2027. Anticipated Award Date is May 2027 with Contract Completion quarter 2 of 2032. The estimated contract value is currently anticipated to be between £60 million and £80 million. This estimate is provided for market engagement purposes only and will be confirmed in the tender notice.

This notice has closed — what to do next

There are 337 open Construction & Infrastructure tenders in United Kingdom.

Browse all open Construction & Infrastructure tenders →

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the closing date and submission window on the official portal before you start preparing your bid.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →