Installation of 950 kW Grid-Connected Ground mounted Solar Photovoltaic Power Plants and 5 Nos. of 10 kW Grid Connected Solar Trees (Total 50 KW) at Mahapurush Srimanta Sankardev Avirbhav Kshetra, Bordua (Batadrava Than), District- Nagaon, Assam
Assam Power Distribution Company Ltd · CGM (NRE)
- Location
- Assam, India
- Closes
- 31 Oct 2026